Laserfiche WebLink
<br />'S. <br />' ` ~ III IIIIIIIIIIIII III <br />M jrvjry~,_P,G,KMjr___LpaL <br />Permi t date __JUlY 31___, 1981_ Perr i t No. C_007-80 __` <br />Permit expiration Data _ __July_ 31__• 1986 <br />THIS PEriMIT is issued by the Mined Land Reclamation <br />Civision. Cepartmer,t of Natural Resources, State of Colorado. <br />?~;jLLS <br />I, Arco_Coal Company ("operator") desires to <br />-------------- <br />COnduCt d mining operation knCwn a5 Mt. Gunnison No. 1 Pfine <br />-°---------- --------------- <br />for the purpose of extracting coal. <br />Ii. Un ____,7y1~~____, 198L_. the .Mined Land Reclamation <br />Division ("the division") apprcvec operator's application <br />for this permit, fixed the amount of bend and directed that <br />this permit be issuetl upon the filing with the divisidn cf <br />bond in the amount so fixed in form and substance approved <br />by the division, and such bona has been so furnished: <br />II[. Un _,Zy„]uy„~j~_______, 19dLr the division made the fol- <br />lOwiny findinys~ <br />a) the permit application is accurate and contains <br />all information required under Q.R.S. 1973. 34-33-1~L g= <br />ga. and regulations promulgated thereunder and that all <br />Che r2gUirements Of drt~Cle 33 df title 34. C.R.$. 1973 <br />("Such drtlCl a") fOr [he issue Of a permiC have been CCmplied <br />with; <br />b) The applicant has demonstrated that reclamation <br />as required by such article can be acccmplisr.ed under the <br />reclamation plan contained in the permit applicat;en; <br />c) the assessment of the probable cumulative impact <br />of all anticipated mining in the area on the hycrclogic bal- <br />ance specified in section 34-33-110(2) (1) has been made ~y <br />the division and the proposed operation thereof has been <br />designed to prevent material damage to hydrologic balance <br />outside the permit area; <br />d) Granting the pe rrcit will not conflict with any <br />desi~gnacion decision iss~ied pursuant to Section 522 of Cn•? <br />federal "surface ~lininy Concrcl and Reclamation act cf 1977". <br />as amended, (P.L. 95-37), nor ;s the area propcsetl to Da <br />mine0 within an arP.d under study for unsuitdCility CeSignd- <br />tiOn in do administrative proceeding commenced p~~rsudnt t0 <br />section 34-33-L26 or section 522 cf said P.L. o5-d7. <br />e) (I) Unless the proposed operation was an cper- <br />dtiOn which prOdUCed COdI in COmmerCial quantiti25 in the <br />