Laserfiche WebLink
STATUS: Complied with. All of the permits listed above have been submitted and the <br />stipulation has been satisfied. <br />STIPULATION NO. 2 <br />PRIOR TO CONSTRUCTION OF POND 11, SENECA COAL COMPANY MUST SUBMIT <br />ADDITIONAL RECLAMATION PERFORMANCE BOND TO THE DIVISION. THE BOND <br />AMOUNT MUST BE APPROVED BY THE DIVISION. <br />STATUS: Complied with 01/18/96. Stipulation No. 2 has been satisfied by submittal of TR-02. <br />STIPULATION NO. 3 <br />PRIOR TO CONSTRUCTION OF TOPSOIL PILE F, SENECA COAL COMPANY MUST <br />SUBMTI ADDITIONAL RECLAMATION PERFORMANCE BOND TO THE DIVISION. THE <br />BOND AMOUNT MUST BE APPROVED BY THE DIVISION. <br />STATUS: Complied with 10/21/97. Stipulation No. 3 was satisfied by the submittal of MR-11 <br />which eliminated Topsoil Pile H and transferred the bonding liability associated with Pile H to Pile <br />F. <br />STIPULATION NO.4 <br />PRIOR TO RETENTION OF THE YOAST HAUL ROAD AS PART OF THE POST MINING <br />LAND USE, A SIGNED CONSENT FORM FROM MANEOTIS SHEEP COMPANY MUST BE <br />SUBMITTED TO THE DIVISION. <br />STATUS: Complied with. Stipulation No. 4 has been satisfied by the submittal of a signed <br />consent form dated 05/08/96, now contained within the permit document. <br />STIPULATION NO. S <br />WITHIN 180 DAYS OF PERMIT ISSUANCE AND PRIOR TO CONSTRUCTION OF POND 11, <br />THE APPLICANT SHALL SUBMTI' A TECHNICAL REVISION TO THE YOAST PERMTT <br />WHICH DEMONSTRATES THAT POND 11 WILL BE LOCATED AS NEAR AS <br />PRACTICABLE TO THE DISTURBED AREA, AND THAT THE POND EMBANKMENT HAS <br />A MINIMUM STATIC SAFETY FACTOR OF 1.3. <br />STATUS: Complied with 07/28/97. Stipulation No. 5 has been satisfied, the location acceptance <br />documented in a letter dated 03/03/97 and the static safety factor satisfied by approval of TR-06. <br />Youc Mine 3 March F. 2001 <br />