My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33508
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:27 PM
Creation date
11/23/2007 7:39:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
3/6/2001
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR RN1
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br />Surface Water Monitoring <br />Site Name Discharge Water Ouality° <br />YSSF2 Continuous Monthly/Triannual <br />YSSF3 Continuous Monthly/Triannual <br />YSS2 Monthly Monthly/Triannual <br />YSGFS Monthly Monthly/Triannual <br />YSGS Triannual° Trainnal° <br />NPDES Sites See Page 25 <br />Borings <br />YSPG6 Semiannual Semiannual <br />YS PG10 Semiannual Semiannual <br />Discharge measurements (both continuous and monthly) will be conducted March - <br />October only. <br />Water Quality Monthly = field parameters only (pH, temperature, and electrical <br />conductivity), March through October only. <br />Water Quality Triannual = Water samples will be analyzed according to the surface <br />water parameter list as given in the permit in Table 15-5 during snowmelt runoff <br />(April), post-runoff (May or June), and baseflow (September). <br />Semiannual is May/June and September/October, and includes field parameters and <br />the list of parameters in Table 4 of this document. <br />"If flow is less than 5 gallons per minute, then only field parameters will be <br />measured. <br />°For site YSGS, triannual discharge measurements and water quality samples (total <br />dissolved solides) will take place during May, July, and September. <br />Yout Mine 4 ) March 6. ?001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.