My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33482
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33482
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:26 PM
Creation date
11/23/2007 7:38:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
9/28/1993
Doc Name
GEC RECLAMATION SCHEDULE
From
DMG
To
THE CORLEY CO
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
._ • iii iiiiiiiiiiiu iii • <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1713 Sherman 51 . Room 215 <br />Denvcr, CO 80203 <br />Phone: (3071 866-7567 <br />FAX: 003)81?-8106 <br />September 28, 1993 <br />Dr. W.D. Corley, Jr. <br />The Corley Company <br />P.O. Box 1821 <br />Colorado Springs, CO 80901 <br />RE: GEC Reclamation Schedule <br />Dear Dr. Corley: <br />Roy Romer <br />Governor <br />Michael8 Long <br />Division Director <br />At the August 25-26, 1993 meeting of the Colorado Mined Land Reclamation Board, the <br />Board directed the Division to develop a schedule regarding the reclamation of the GEC <br />Minerals Strip Mine disturbance. <br />The following is the schedule developed jointly between the Inactive Mine and Coal <br />Programs. We've included significant events that have occurred prior to and immediately <br />following since the August 1993 Board Meeting. <br />1. June 1993 <br />2. July 1993 <br />3. August 1993 <br />~F Oro <br />,:~ <br />~c~' ~"~~ <br />•~re76~ <br />a. Held on-site meeting with the Corley Company <br />regarding proposed reclamation of Section 24 and <br />the West Pit Diversion. <br />a. Finalized Bid Document for Section 24 and West <br />Pit projects. <br />a. Conducted Pre-Bid Meeting for Section 24 and <br />West Pit projects. <br />b. Made amendments to Bid Document following Pre- <br />Bid Meeting. <br />c. Awarded Bid. <br />4. September 1993 <br />~ Conducted two pre-construction meetings with Bid <br />Awardee. ` r / f <br />(~ (~L... A.a'-C^ VtZ1 ~A~f.N M('~ ~ ~fT{f-GY~ [CAA Ns~vr iti <br />
The URL can be used to link to this page
Your browser does not support the video tag.