Laserfiche WebLink
<br /> <br />Stipulation No. 10 <br />PEABOGY COAL COMPANY MUST REVISE <br />ISSUANCE~THE PERMIT APPLICATION <br />CONTAINMENT~DITCH RECLAMATION. <br />WITHIN THIRTY (301 DAYS OF PERMIT <br />TO ADDRESS THE FINAL DISPOSITION OF <br />Stipulation No. 11 <br />PRIOR TO SEDIMENT POND 006 CONSTRUCTION PEABODY COAL COMPANY MUST OBTAIN A <br />WATER OR STORAGE RIGHT TO STORE WATER AT THIS POND. THE WATER OR STORAGE <br />RIGHT SHOULD BE INCORPORATED INTO THE PERMIT APPLICATION. <br />Stipulation No. 12 <br />PEABODY COAL COMPANY MUST SUBMIT WITHIN SIXTY (60) DAYS OF PERMIT ISSUANCE <br />A DETAILED PLAN FOR POND DEWATERING TO A LEVEL TO ENSURE CONTAINMENT OF A <br />TEN-YEAR, TWENTY-FOUR HOUR STORM WITHOUT DISCHARGE THROUGH THE EMERGENCY <br />SPILLWAY. <br />Stipulation No. 13 <br />A PERFORMANCE BOND IN THE AMOUNT OF E2,646,300.00 PAYABLE TO THE STATE OF <br />COLORADO AND THE OFFICE OF SURFACE MINING, MUST BE FILED WITH THE DIVISION <br />WITHIN 30 DAYS OF ISSUANCE OF THE PROPOSED DECISION. <br />Stipulation No. 14 <br />SUBMIT REVISED MAPS AND PAGES FOR MR08, REALIGNMENT OF HAUL ROAD A BETWEEN <br />STATIONS 64+00 and 81+00. NEW ADJUSTMENT WILL SHORTEN HR A SLIGHTLY, <br />INCREASE GRADE FROM APPROXIMATELY 69; TO 7~, AND ELIMINATE TWO HAIRPIN <br />TURNS. SUBMITTAL SHOULD INCLUDE REVISED TABLE 12-4 (CULVERT SIZING), <br />REVISED EXHIBITS 7-10, 12-1, 12-8A4 AND ANY OTHER PAGES OR EXHIBITS <br />PERTAINING TO THIS STRETCH OF HR A. SUBMITTAL SHALL BE MADE BY <br />NOVEMBER 20, 1989 <br />Stipulation No. 15 <br />PEABODY COAL COMPANY MUST SUBMIT BONDING INFORMATION TO COVER COSTS OF <br />HAUL ROAD SURFACE MATERIAL REMOVAL, INITIAL CAST SPOIL MATERIAL <br />REPLACEMENT, AND TOPSOIL REPLACEMENT BY DECEMBER 22, 1989. THIS <br />INFORMATION MUST COVER, AT A MINIMUM, ALL SPECIFIC TASKS WHICH WERE <br />ADDRESSED IN TECHNICAL REVISION NUMBER FIVE, SUBSEQUENT DIVISION ADEQUACY <br />REVIEW LETTERS, AND PEABODY RESPONSES TO THOSE LETTERS. <br />1225E/sca <br />