My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33264
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:20 PM
Creation date
11/23/2007 7:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
5/7/2001
Doc Name
INTEROFFICE MEMORANDUM ROADSIDE PORTALS RECLAMATION COST ESTIMATE REMAINING RECLMATION
From
DMG
To
DAN MATHEWS
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task p : 092 <br />Date : 04/27/2001 <br />User : JRS <br />PermiUjob k : C-81-041 <br />Abbreviation :none <br />Filename : C041-092 <br />Agency or organization name :Colorado Division Ot Minerals And Geology <br />Permit or other job action :Roadside Portals Current Liability <br />Task description : BacMill and Grade "Old" Upland Diversion Ditch (TR-32) <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County :Mesa <br />Site :Roadside Portals <br />Machine description :Cat 3158 <br />Cost Breakdown : Utilization °/, <br />OwnershipcosUhour: $20.65 NA <br />OperatingcosUhour: $21.15 100 <br />OperatorcosUhour: $28.18 NA <br />Total unit cosUhour : $69.98 <br />MATERIAL QUANTITIES <br />Initial Swell Lcose <br />volume: 831 BCY (actor: '1.330 volume <br />Source of estimated volume :Exhibit 51 <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded. dumo bucket. swing emDN1 <br />Basic job condition description <br />Secondary job condition within basic description <br />Cycle time value <br />BELOW AVERAGE <br />SEVERE <br />0.30 minutes <br />Bucket Capacity <br />Rated bucket capacity : 0.50 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 0.42 LCY <br />Job Condition Correction Factors <br />Site altitude : 5,000 feet <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted houdy fleet production <br />Horsepower: 99 <br />Weight (MT) : 15.79 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cosUhour : $69.98 <br />1,105 LCY <br />Source <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shifUday) <br />Net job correction : 0.83 multiplier <br />85.57 LCYlhour <br />71.02 LCY/hour <br />71.02 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 15.56 hours <br />Unit cost : $0.985 per LCY Total job cost : $1,089 <br />
The URL can be used to link to this page
Your browser does not support the video tag.