My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33264
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:20 PM
Creation date
11/23/2007 7:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
5/7/2001
Doc Name
INTEROFFICE MEMORANDUM ROADSIDE PORTALS RECLAMATION COST ESTIMATE REMAINING RECLMATION
From
DMG
To
DAN MATHEWS
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : 084 State :Colorado Permit/job # : C-81-041 <br />Date : 04/27/2001 County :Mesa Abbreviation : none <br />User : JRS Site :Roadside Portals Filename : C041-084 <br /> <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Permit or other job action :Roadside Portals Current Liability <br />task description :Excavate for Upland Diversion Ditch -East Side (TR-32) <br /> <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 3158 Horsepower : 99 <br /> Weight (MT) : 15.79 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $20.65 NA Shift basis : 1 per day <br />Operating cosUhour : $21.15 100 Data source : (CRG) <br />Operator cosUhour : $28.18 NA <br />Total unit cosUhour : $69.98 Total fleet cost/hour : $69.98 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 300 BCY factor : 1.330 volume : 399 LCY <br /> <br />Source of estimated volume :Page CRDA2.12, 13d and Exhibit 60 <br />Source of estimated swell (actor :CAT Handbook <br /> <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded dumb bucket swing mo <br />Basic job condition description : BELOW AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.29 minutes <br />Bucket Caoacitv <br />Rated bucket capacity : 0.50 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%J <br />Adjusted bucket capacity : 0.42 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 5, 000 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shi/Uday) <br />Net job correction : 0.63 multiplier <br /> <br />Unadjusted hourly unit production : 88.54 LCY/hour <br />Adjusted hourly unit production : 73.49 LCY/hour <br />Adjusted hourly fleet production : 73.49 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 5.43 hours <br />Unit cost : $0.952 per LCY Total job cost : $380 <br />
The URL can be used to link to this page
Your browser does not support the video tag.