My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33264
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:20 PM
Creation date
11/23/2007 7:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
5/7/2001
Doc Name
INTEROFFICE MEMORANDUM ROADSIDE PORTALS RECLAMATION COST ESTIMATE REMAINING RECLMATION
From
DMG
To
DAN MATHEWS
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task ti : 081 State :Colorado PermiUjobN : C-81-041 <br />Date : 04/23/2001 County :Mesa Abbreviation : none <br />User : JRS Site :Roadside Portals Filename : C041-081 <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Permi t or other job action : Roadside Portals Current Liability <br /> task description : Replace Topsoil on Drill Pad Slot (TR-33) <br />HOURLY E QUIPMENT COST <br /> Basic machine :Cat D8R - 8SU Horsepower : 305 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cost/hour : $49.50 NA <br /> Operating cost hour : $65.98 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cosUhour: $27.99 NA <br /> Total unit cosUhour : $143.48 Total fleet cost hour : $143.48 <br />MATERIAL <br />Initial QUANTITIES <br />Swell Loose <br />volume: 1,000 LCY factor: NA volume: 1,000 LCY <br /> Source of estimated volume :Division Estimate <br /> Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />100 feet <br />852.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />0.00 % ({ <br />5,000 feet <br />2,550 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 Dozers) <br />$0.500 lLCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />0.90 <br />1.00 <br />0.34 <br />Source <br /> <br />28712 LCY/hr <br />287.12 LCY/hr <br />3.48 Hours <br />$500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.