Laserfiche WebLink
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />sheet 1 of 2 <br />Agency or organization name :Colorado Division OI Minerals And Geology <br />Task # : 073 Slate :Colorado PenniKob # :C-81-041 <br />Date : 04/25/2001 County :Mesa Abbreviation :none <br />User : JRS Site :Roadside Portals Filename : C041-073 <br />Permit or other job action : Roadside Portals Current Liability <br />Task description : Haul and Place Rocks lrom CBA-2 to CRDA 1i1 & 2 <br /> <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />TrucWloader team -Truck Generic 12-18 cy, 6x4 <br />-Loader .CAT 950E S.2 std. lilt <br />Support equipment -Load area :Cat D8R - 8SU <br />-Dump area : Caf D8R - 8SU <br />Roatl maintenance -Motor grader ~ NA <br />-Water truck : NA <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename fruck2 loader dozer dozer NA NA <br />q Utilizafion-machine 100 95 100 100 NA NA <br />-Ripper attachment NA NA 100 0 NA NA <br />Ownership cosUhour $20.12 $19.50 $49.50 $49.50 NA NA <br />Ope2ting cosUhour $26.72 $23. f3 $65.98 $65.98 NA NA <br />Ripper op. cosVhour NA NA $7.50 $0.00 NA NA <br />Operator cosVhour . $23.61 $2799 $2799 $27.99 NA NA <br />Unit subtotals $70.45 $70.62 $150.97 $143.48 NA NA <br />Numher of units 2 1 1 f 0 0 <br />Group subtotals Work : $211.52 Support : $294.45 Maintenance : $0.00 <br />Total work team cosVhour : 5505.96 <br />MATERIAL QUANTITIES <br />Initial <br />Swell Loose . <br />volume: 960 BCY factor: 1.000 volume: 960 LCY <br />Source of quantity take-oft : Tab 14; Figure 14-4; Division Estimate <br />Source of esfimated swell factor : Whole Rocks => No Swell <br />Material purchase cost : <br />O $0.00 /LCY Total cost : $0 <br />URLY PRODUCTION <br />H <br />Truek Caoaelri <br />Truck Payload (weight) Basis : <br /> <br />Truck Bed (volume) Basis <br />Material weight : 4.250 pounds/LCY Struck volume : 12.00 LCY <br />Descr.: USER-PROVIDED WEIGHT DATA Heaped volume : 18.00 LCY <br />Rated payload : 48.000 pounds Average volume : 15.00 LCY <br />Payload capacity : 11.29 LCY Adjusted capacity : 11.29 LCY <br />Final adjustetl truck capacity based on spe cific number of loader passes : 10.50 LCY <br />Loading Tool Caoaelri : t' ~ Site altitude (tt.) : 5.000 <br />Rated capacity (nom. heaped) : 3.500 LCY Truck ~ Loader Source <br />Descr.: USER-PROVIDED BUCKET FILL FACTOR Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 0.500 Job efficiency : 0.830 0.830 (1 shiR/day) <br />Adjusted bucket capacity : 1.750 LCY Net correc0on : 0.830 0.830 <br />