Laserfiche WebLink
CIRCES Cost Estlmatinc,LSottware <br />TRUCK/LOADER TEAM WORK <br />sheet t of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division O! Minerals And Geology <br />Task N : 072 State :Colorado Permiffjob R : C-81-041 <br />Date : 0425/2001 County :Mesa Abbreviation :none <br />User : JRS Site :Roadside Portals Filename : C041-072 <br />Permit or other job action :Roadside Porte/s Current Liability <br />Task description :Haul Roadside North Gob Pile fo CRDA N2 <br />Shift basis : 1 per day <br />Truck loader team -Truck ~Genedc 12-18 cy, 6x4 <br />-Loader CAT 950E S.2 std. IiR (1998) <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />D8R-8SU <br />UBH - BSU <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />Utilization-machine . 89 100 25 100 NA NA <br />-Ripper attachment NA NA 25 0 NA NA <br />Ownership cosf/hour. $20.12 $19.50 $49.50 $49.50 NA NA <br />Operafing cosVhour $23.82 $24.28 $16.50 $65.98 NA NA <br />Ripper op. cosVhour NA NA 31.87 $0.00 NA NA <br />Operator cosVhour $23.61 $27.99 $27.99 $2799 NA NA <br />Unit subtotals $67.55 $71.77 $95.86 $143.48 NA NA <br />Number of units : 4 1 1 1 0 0 <br />Group subtotals : Work : $341.97 Support : $239.34 Maintenance : $0.00 <br />Total work team cosUhour : 5581.31 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 2.900 LCY <br />Swell Loose <br />factor: NA volume <br />Source of quantity takeoff :TR-2t <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truek Caoaclty <br />Truck Pavload (weiehtt Basis <br />Total cost <br />Truck Bed (volume) Basis <br />2,900 LCY <br />Material weight: 1,600 pounds/LCY Struck volume: 12.00 LCY <br />Descr.: Coal -bituminous, raw Heaped volume : 18.00 LCY <br />Ratetl payload : 48,000 pounds Average volume : 75.00 LCY <br />Payload capacity : 30.00 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 15.31 LCY <br />Loading Tool CanaelN <br />Rated capacity (nom. heapetl) : 3.500 LCY <br />Descr.: Loose matedal - t' and over (85 - 90% <br />Bucket fill factor : 0.875 <br />Adjusted bucket capacity : 3.062 LCY <br />Site altitude (h.) : 5,000 <br /> Truck ~ Loader ~ Source <br />Altitude adj.. 1.000 1.000 (Cat HE <br />Job efficiency . 0.830 0.830 (1 shiWda <br />Net correction . 0.830 0.830 <br />