My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33264
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:20 PM
Creation date
11/23/2007 7:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
5/7/2001
Doc Name
INTEROFFICE MEMORANDUM ROADSIDE PORTALS RECLAMATION COST ESTIMATE REMAINING RECLMATION
From
DMG
To
DAN MATHEWS
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatint~oftware <br />TRUCK/LOADER TEAM WORK <br />sheet t of 2 <br />Agency or organization name :Colorado Division O! Minerals And Geology <br />Task # : 071 State :Colorado PenniUob # : C-81-041 <br />Date : 04/25/2001 County :Mesa Abbreviation :none <br />User : JRS Site :Roadside Portals Filename : C041.071 <br />Permit or other job action :Roadside Portals Current Liability <br />Task description :Haul Roadside North Coal Footprint to CRDA #2 <br />HOURLY EQUIPMENT COST Shitt basis : 1 per day <br />Equipment Descdption <br />Truck loader team -Truck :Generic 12-18 cy, 6z4 <br />-Loader .CAT 950E S.2 std. IiR (7998) <br />Support equipment -Load area :Cat D8R - 8SU <br />-Dump area Cat D8R - 8SU <br />Road maintenance -Motor grader NA <br />-Water truck : NA <br />Cost Breakdown : ruck/LOad <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename . truck2 loader dozer dozer NA NA <br />Utilization-machine a9 100 25 100 NA NA <br />-Ripper attachment NA NA 25 0 NA NA <br />Ownership cost/hour ~ $20.12 $19.50 $49.50 $49.50 NA NA <br />Operafing cosVhour~ $23.82 $24.28 $16.50 $65.98 NA NA <br />Ripper op. cosf/hour : NA NA $7.87 $0.00 NA NA <br />Operator cosUhour. $23.61 $27.99 $2799 $2799 NA NA <br />Unit subtotals : $67.55 $77.77 $95.86 $743.48 NA NA <br />Number at units : 4 1 1 1 0 0 <br />Group subtotals : Work : ,8341.97 Support : $239.34 Maintenance : $0.00 <br />Togl work team cosvhour : $581.31 <br />Inifial Swell <br />volume : 4,000 LCY factor <br />Source of quantity take-oH : 10% o! Stockpile <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Capacity <br />ToWI cost <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 7,600 pounds/LCY Struck volume <br />Descr.: Coal -bituminous, raw Heaped volume <br />Rated payload : 48,000 pounds Average volume <br />Payload capacity : 30.00 LCY Adjusted capacity <br />Final adjusted truck capacity based on specific number of loader passes <br />Loatling Tool CaoaciN <br />Rated capacity (nom. heaped) : 3.500 LCY Truck <br />Descr.: Loose matedal - 1' and over (85 - 90%) Altitude adj. 1.000 <br />Bucket till lactor : 0.875 Job efficiency 0.830 <br />Adjusted bucket capacity : 3.062 LCY Net correction 0.830 <br />Loose <br />NA volume: 4,000 LCY <br />$0 <br />12.00 LCY <br />18.00 LCY <br />15.00 LCY <br />15.00 LCY <br />15.31 LCY <br />Site altitude (tt.) : 5.000 <br />Loader Source <br />1.000 (Cat H8 <br />0.830 (1 shitf/da <br />0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.