Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task n : 069 <br />Date : 04/23/2001 <br />User: JRS <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Roadside Portals Current Liability <br />Task description :Remove Temporary Access Road #10 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />MATERIAL QUANTITIES <br />State :Colorado <br />County :Mesa <br />Site :Roadside Portals <br />Basic machine :Cat D8R - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />Ownership cost/hour : $49.50 NA <br />Operatingcost/hour : $65.98 100 <br />Ripper op. cost hour : $0.00 0 <br />Operator cosUhour : $27.99 NA <br />Total unit cosUhour : $143.48 Total fleet cosUhour <br />$143.48 <br />Initial Swell Loose <br />volume : 2,000 CCY factor : 1.165 volume : 2,330 LCY <br />Source of estimated volume : MR-22; Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Jo b Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job eNiciency : 0.83 (1shiN/day) <br />Compacted till or embankment Spoil pile : 0.80 (Ind-A) <br /> Push gradient : 0.76 (Cat HB) <br />Average push gradient : 11.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,000 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.27 <br />Weight description <br />Decomposed rock - 50% Rock, 50 % Earth Adjusted unit production : 231.14 LCY/hr <br /> Adjusted fleet production : 231.14 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 10.08 Hours <br />Unit cost : $0.621 lLCY Total job cost : $1,446 <br />Permit(obN : C-81-041 <br />Abbreviation :none <br />Filename : C041-069 <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />