Laserfiche WebLink
CIRCES Cost Estimati~ Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task q : 060 <br />Date : 04/23/2001 <br />User: JRS <br />State :Colorado <br />County :Mesa <br />Site :Roadside Portals <br />Agency or organization name :Colorado Division Ol Minerals And Geology <br />Permit or other job action :Roadside Portals Current Liability <br />Task description : Bacikfill and Topsoil Pond f 1 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 11,158 <br />Basic machine :Cat D8R - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization %, <br />Ownershipcost/hour : $49.50 NA <br />Operatingcost/hour : $65.98 700 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $2799 NA <br />Total unit cosVhour : $143.48 Total fleet cosVhour <br />Swell Loose <br />CCY factor: 1.165 volume: 12,999 <br />Source of estimated volume :1986OMG Estimate <br />Source oT estimated swell factor :CAT Handbook <br />$143.48 <br />LCY <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 4,900 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50 % Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.474 /LCY <br />Job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency: 0.83 (lshift/day <br />Spoil pile : 0.80 (Ind-ri) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 7.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.36 <br />Adjusted unit production : 302.96 LCY/hr <br />Adjusted fleet production : 302.96 LCY/hr <br />Total job time : 42,91 Hours <br />Total job cost : $6,156 <br />Permit/jobk : C-81-041 <br />Abbreviation :none <br />Filename : C041-060 <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />