My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33264
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:20 PM
Creation date
11/23/2007 7:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
5/7/2001
Doc Name
INTEROFFICE MEMORANDUM ROADSIDE PORTALS RECLAMATION COST ESTIMATE REMAINING RECLMATION
From
DMG
To
DAN MATHEWS
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 036 <br />Date : 04/23/2001 <br />User : JRS <br />State :Colorado <br />County :Mesa <br />Site :Roadside Portals <br />Agency or organization name :Colorado Division OI Minerals And Geology <br />Permit or other job action :Roadside Portals Current Liability <br />Task description :BaciAill and Topsoil Pond 6 at CRDA #1 <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8SU Horsepower : 305 <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : t per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.50 NA <br />OperatingcosUhour : $65.98 100 <br />Ripper op. cosVhour : $0.00 0 <br />Operator cosUhour : $2799 NA <br />Total unit cosUhour : $143.46 Total fleet cosUhour: $143.48 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,000 CCY factor : 1.165 volume : 6,990 LCY <br />Source of estimated volume :1986 DMG Estima te <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshitUday) <br />Compacted /ill or embankment Spoil pile : 0.80 (/nd-A) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,850 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.36 <br />Weight description <br />Decomposed rock - 50% Rock, 50°a Earth Adjusted unit production : 302.96 LCY/hr <br /> Adjusted fleet production : 302.96 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 23.07 Hours <br />Unit cost : $0.474 /LCY Total job cost : $3,310 <br />PermiUjobp : C-81-041 <br />Abbreviation :none <br />Filename : C041-036 <br />
The URL can be used to link to this page
Your browser does not support the video tag.