Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 025 <br />Date : 04/20/2007 <br />User: JRS <br />PermiUjob# : C-81-041 <br />Abbreviation :none <br />Filename : C047-025 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Roadside Portals Current Liability <br />Task descdption :Finish Grade Steep Slopes at Roadside, CRDA 1 & 2 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Data source : (CRG) <br />MATERIAL QUANTITIES <br />Initial <br />volume : 125,033 LCY <br />Swell Loose <br />factor : NA volume : 125,033 LCY <br />Source of estimated volume :7986 DMG Estimate <br />Source of estimated swell factor : NA <br />State :Colorado <br />County :Mesa <br />Site :Roadside Portals <br />Basic machine :Car D8R - 85U Horsepower : 305 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Utilization °1° <br />Ownership cosVhour : $49.50 NA <br />Operating cosUhour : $65.98 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosUhour : $2799 NA <br />Total unit cosUhour : $143.48 Total fleet cosUhour <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Loose stockpile <br />55 feet <br />1,323.4 LCY/hr <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 5,000 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50°b Earth <br />Job Condition Correction Factors <br />Operator skill :_ <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile :_ <br />Push gradient: <br />Altitude <br />Material weight :- <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 1 Dozerts) <br />Unit cost : $0.229 /LCY <br />Total job time <br />Total job cost <br />0.75 <br />1.20 <br />1.00 <br />7.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />0.79 <br />1.00 <br />0.47 <br />R14?_dR <br />Source <br />(!nd-d) <br />627.01 LCY/hr <br />627.01 LCYlhr <br />199.41 Hours <br />$28,611 <br />