Laserfiche WebLink
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT I DENTIFICATION <br /> Agency or organization name :Colorado Division O/ Minerals And Geology <br />Task fl: 020 State :Colorado PerrniVob k:C-81-041 <br />Date: 04/25/2001 Counry :Mesa Abbreviation :none <br />User : JRS Site :Roadside Portals Filename : C041-020 <br />sheet 1 of 2 <br />Permit or other job action :Roadside Portals Current Liability <br />Task description :Haul Cover lrom Coa! Creek to CRDA N2 <br />HOURLY EQUIPMENT COST <br />TrucWloader team -Truck :Generic 12-18 cy, 6x4 <br />-Loader CAT950F S.2 std. lift (1998) <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Shift basis : 1 per day <br />D8R - eSU <br />u6rr - as u <br />Cost Breakdown ~ ruck7Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : fruck2 loader dozer dozer NA NA <br />Utilization-machine : 90 100 25 100 NA NA <br />-Ripper attachment : NA NA 25 0 NA NA <br />Ownership cosUhour: $20.72 $19.50 $49.50 $49.50 NA NA <br />Operating cosVhour: $24.13 $24.28 $16.50 $65.98 NA NA <br />Ripper op. cosVhour: NA NA 51.87 $0.00 NA NA <br />Operator cosVhour : $23.61 $27.99 52799 $27.99 NA NA <br />Unit subtotals: 567.86 $7).77 $95.86 $)43.48 NA NA <br />Number of units : 4 1 1 2 0 0 <br />Group subtotals : Work : 5343.20 Support : $382.81 Maintenance : $0.00 <br />Total work team cost/hour : 5726.02 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 2,629 CCY factor : ). )65 volume: 3,063 LCY <br />Source of quantity take-off :Exhibits 9A. 98, 51 and 52 <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cast : $0.00 /LCY Total cost : 50 <br />HOURLY PRODUCTION <br />Truck Caoaciri <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,900 pounds/LCY Struck volume : 12.00 LCY <br />Descr.: Decomposed rock - 50°o rock, 50 % earth Heaped volume: )8.00 LCY <br />Rated payload : 48,000 pounds Average volume : )5.00 LCY <br />Payload capacity : 16.55 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on spewlic number of loader passes : 15.31 LCY <br />Loading Tool Caoaciri ~ nditio tl n Site altitude (M.) : 5.000 <br />Rated capacity (nom. heaped) : 3.500 LCY Truck Loader Source <br />Descr.: Loose material - I/2' to 3r4' (85 - 90%) Altitude adj.: 1.000 ).000 (Cal HB) <br />Bucket fill laclor : 0.875 Job efficiency : 0.830 0.830 /1 shrN/dayJ <br />Adjusted bucket capacity : 3.062 LCY Net correction : 0.830 0.830 <br />