Laserfiche WebLink
i <br />CIRCES Cost Estimating_Sokware <br />TRUCK/LOADER TEAM WORK <br />sheet ~ of 2 <br /> Agency or organization name :Colorado Division O! Minerals And Geology <br />Task p : 019 State :Colorado Permit(ob H : C-81-041 <br />Date : 04/25/2001 County :Mesa Abbreviation : none <br />User : JRS Site :Roadside Porto/s Filename : C041-019 <br /> <br />Permit or other job action :Roadside Portals Current Liability <br /> Task description :Haul Cover from Stockpile 8 to CRDA H2 <br /> <br />HOURLY EQ UIPMENT COST Shill basis : i per day <br /> Equipment Descdptian <br />TrucWloader team -Truck <br />-Loader. <br />Suppon equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />aric 12-18 cy, 6x4 <br />950E S.2 std. IiR <br />78R - 8SU <br />D8R-8SU <br />Cost Breakdown : rucWLOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />Utilization-machine : 100 90 25 100 NA NA <br />-Ripper attachment : NA NA 25 0 NA NA <br />Ownership cosUhour : $20.12 $19.50 $49.50 $49.50 NA NA <br />Operating cosVhour: 526.72 $2i.81 $16.50 $65.98 NA NA <br />Ripper op. cosUhour: NA NA $1.87 $0.00 NA NA <br />Operator cosVhour : $23.61 $2799 $27.99 $27.99 NA NA <br />Unit subtotals: $70.45 $69.30 595.86 $143.48 NA NA <br />Number of units : 3 1 1 2 0 0 <br />Group subtotals : Work : $280.66 Support : $382.87 Maintenance : $0.00 <br />Total work team cosUhour : 5663.47 <br />MATERIAL OUANTI <br />Initial Swell Loose <br />volume : 5.600 CCY factor : 1.165 volume : 6,524 LCY <br />Source of quantity lake-oH :Exhibits 9A, 98, 51 and 52 <br />Source of estimated swell )actor :CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capgcity.; <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weigh) : 2,900 pounds/LCY Struck volume : 12.00 LCY <br />Descr.: Decomposed rock - 50°o rock, 50°b earth Heaped volume : 18.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 16.55 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on specific number of loader passes : 15.31 LCY <br />Loading Tool Capacity <br />Rated capacity (nom. heaped) : 3.500 LCY <br />Descr.: Loose material - 1/2' to 3r4' (85 - 90°b , <br />Bucket fill factor : 0.875 <br />Adjusted bucket capacity : 3.062 LCY <br />lob Condition C orrections : Site altitude (tt.) <br /> Truck loader <br />Altitude adl.: 1.000 1.000 <br />Job effciency . 0.830 0.830 (1 <br />Net correction . 0.830 0.830 <br />