My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33264
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:20 PM
Creation date
11/23/2007 7:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
5/7/2001
Doc Name
INTEROFFICE MEMORANDUM ROADSIDE PORTALS RECLAMATION COST ESTIMATE REMAINING RECLMATION
From
DMG
To
DAN MATHEWS
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Task q <br />Date <br />User <br />Agency or organization name :Colorado Division O(Minerals And Geology <br />017 State :Colorado Permitlob 71 : C-Bf-041 <br />05/07/2001 County :Mesa Abbreviation :none <br />JRS Site :Roadside Portals Filename : C041-017 <br />Permit or other jab action :Remaining Reclamation at Roadside Portals <br />Task descdption :Haul Cover /rom CBA-2 to CRDA +Y2 <br />sheet t o12 <br />HOURLY EQUIPMENT COST Shitt basis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck :Generic 12-18 cy, 6x4 <br />-Loader :CAT 950E S.2 std. lift (7998) <br />Support equipment -Load area :Cat D8R - 85U <br />-Dump area :Cat D8R - 8SU <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />Cost Breakdown : ruck/LOad <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />%Utilization-machine: 99 100 25 700 NA NA <br />-Ripper attachment : NA NA 25 0 NA NA <br />Ownership cost/hour : $20.72 $19.50 $49.50 $49.50 NA NA <br />Operating cost hour : $26.49 $24.28 $16.50 $65.98 NA NA <br />Ripper op. cosVhour : NA NA $1.87 $0.00 NA NA <br />Operator cost/hour : 523.67 ,$27.99 $27.99 527.99 NA NA <br />Unit subtotals : $70.21 $71.77 $95.86 $143.48 NA NA <br />Number of units : 4 1 1 2 0 0 <br />Group subtotals: Work: $352.63 Support: $382.81 Maintenance: $0.00 <br />Total work team cost/hour : 5735.44 <br />Initial Swell Loose <br />volume: 25,300 CCY factor : 1.765 volume: 29,474 LCY <br />Source of quantity take-off :Exhibits 9A, 9B, 51 and 52 <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : SO <br />HOURLY PRODUCTION <br />T <br />k C <br />l <br />ruc <br />eoec <br />ri: <br />Truck Payload (weight) Basis : <br />Truck Bed (volume) Basis <br />Material weight : 2.900 pounds/LCY Struck volume : 12.00 LCY <br />Descr.: Decomposed rock - 50°b rock, 50°s eadh Heaped volume : 18.00 LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 16.55 LCY Adjusted capacity : 15.00 LCY <br />Final adjusted truck capacity based on specific number o} loader passes : 15.31 LCY <br />Loading Tool Capaciri : t Site altitude (H.) : 5,000 <br />Rated capacity (nom. heaped) : 3.500 LCY Truck Loader Source <br />Descr.: Loose matedal - 1/2' fo 3/4' (85 - 90%) Altitude adj.: 1.000 7.000 (Cat HB) <br />Bucket till factor : 0.875 Job efficiency : 0.830 0.830 (1 shi/t/day) <br />Adjusted bucket capacity : 3.062 LCY Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.