My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33264
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:20 PM
Creation date
11/23/2007 7:35:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
5/7/2001
Doc Name
INTEROFFICE MEMORANDUM ROADSIDE PORTALS RECLAMATION COST ESTIMATE REMAINING RECLMATION
From
DMG
To
DAN MATHEWS
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Task a <br />Date <br />User <br />Agency or organization name :Colorado Division OI Minerals And Geology <br />016 State :Colorado PermiVob ll:C-81-041 <br />05/07/2001 County :Mesa Abbreviation :none <br />JRS Site :ROadside Portals Filename:C041-016 <br />Permit or other job action :Remaining Reclamation at Roadside Podals <br />Task description :Haul Cover /rom CBA-2 to CRDA #1 <br />sheet 1 of 2 <br />HOURLY EQUIPMENT COST Shin basis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck :Generic 12-18 cy, 6x4 <br />-Loader :CAT 950E S.2 std. IiR (1998) <br />Support equipment -Load area :Cat D8R - 8SU <br />-Dump area :Cat D8R - 8SU <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />Cost Breaktlown : Truck/LOader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />Utilization-machine : 100 91 25 100 NA NA <br />-Ripper attachment: NA NA 25 0 NA NA <br />Ownership cosVhour: $20.12 $19.50 $49.50 $49.50 NA NA <br />Operating cosVhour: $26.72 $22.12 $16.50 $65.98 NA NA <br />Ripper op. cosUhour : NA NA $1.87 $0.00 NA NA <br />Operator cost/hour : $23.61 $27.99 $27.99 $27.99 NA NA <br />Unit subtotals : $70.45 $69.61 $95.86 $143.48 NA NA <br />Number of units : 2 1 1 2 0 0 <br />Group subtotals : Work : $210.51 Support : $382.81 Maintenance : $0.00 <br />Total work team cosUhour : $593.33 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 24.700 CCY factor : 1.165 <br />Source of quantity take-oH :Exhibits 9A, 9B. 51 and 52 <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Ca an city <br />Truck Pavlo <br />Descr. <br />Total cost <br />ad (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,900 pounds/LCY Struck volume <br />imposed rock - 50°a rock, 50°~o earth Heaped volume <br />Rated payload : 48,000 pounds Average volume <br />Payload capacity : 16.55 LCY Adjusted capacity <br />Final adjusted truck capacity based on specific number of loader passes <br />$0 <br />12.00 LCY <br />18.00 LCY <br />15.00 LCY <br />15.00 LCY <br />15.31 LCY <br />Loading Tool Ca achy : o n Itlon orreaion Site altitude (ft.) : 5,000 <br />Rated capacity (nom. heaped) : 3.500 LCY Truck Loader Source <br />Descr.: Loose material - 1!2' to 3/4' (85 - 90°0) Altitude adj.: 1.000 1.000 (Cat HE <br />Bucket fill factor : 0.875 Job efficiency : 0.830 0.830 (1 shifUda <br />Adjusted bucket capacity : 3.062 LCV Net correction : 0.830 0.830 <br />Loose <br />volume: 28,776 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.