Laserfiche WebLink
CIRCES Cost Estimating_Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION <br />Task # : 014 <br />Date : 24-Apr-2001 <br />User: JRS <br />Agency or organization name :Colorado Division O(Minerals And <br />Permit or other job action :Roadside Portals Current Liability <br />Task description :Compact Refuse at CRDA #2 <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County :Mesa <br />Site :Roadside Portals <br />Machine description :CAT 815E <br />Horsepower: 220 <br />Compactor type :Reclamation <br />Shift basis : 1 per day <br />Utilization %, Data source : (CRG) <br />Cost Breakdown : Ownership cosUhour : $48.44 NA <br />Operating cosUhour : $43.77 700 <br />Operator cosUhour : $27.55 NA <br />Total unit cosVhour : $119.69 Total fleet cosUhour : 5119.69 <br />MATERIAL QUANTITIES <br />Loose Shrinkage Compacted <br />volume : 33,880 LCY factor : 0.870 volume : 29,476 CCY <br />Source of estimated volume :1986 DMG Estimate <br />Source of estimated shrinkage factor :CAT Handbook <br />HOURLY PRODUCTION <br />Unadiusted hourly production = (W x S x L x C1 / P <br />Compacted width per pass (W) : 6.42 feet <br />Average compactor speed (S) : 4.00 mph <br />Compacted thickness of each lift (L) : 72.00 inches <br />Conversion constant (C) : 16.3 (5,280 H./12 in.l27 cu.ft.) <br />Required number of machine passes (P) : 5 passes <br />Unadjusted hourly unit production : 7,004.60 CCY/hr <br />Job Condition Correction Factors <br />Site altitude: 5,000 feet <br />Source <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time <br />Unit cost ,30.744 per CCY Total job cost <br />Permit/job t! : C-81-041 <br />Abbreviation :none <br />Filename : C047-014 <br />833.82 CCY/hr <br />833.82 CCY/hr <br />35.35 hours <br />$4,231 <br />