Laserfiche WebLink
RIDER TO MINING PERMIT <br />Permit Date: July 25, 1997 <br />Permit No: C-80-005 <br />The following additional stipulations form an integral part of the foregoing permit: <br />Stipulation No. <br />Description <br />3. IF DURING THE COURSE OF MINING OPERATIONS, <br />PREVIOUSLY UNIDENTIFIED CULTURAL RESOURCES ARE <br />DISCOVERED, THE PERMITTEE SHALL INSURE THAT THE <br />SITE IS NOT DISTURBED AND SHALL NOTIFY MLRD AND <br />OSM. THE PERMITTEE SHALL INSURE THAT THE RESOURCE <br />IS PROPERLY EVALUATED IN TERMS OF THE NATIONAL <br />HISTORIC PLACES ELIGIBILITY CRITERIA(36 CFR <br />60.61).SHOULD RESOURCE BE DETERM'D ELIG. FOR LISTING <br />ON THE NATIN'L REGISTAPPROPRIATE MITIGATION <br />MEASURES WILL BE DEVELOPED & IMPLEMENTED IN <br />CONSULTATION WITH MLRD,OSM,BLM, SHPO. EQUALS <br />STIP #1 IN RENEWAL #1 <br />17. THE ENBANKMENT MUST BE INSPECTED ANNUALLY, OR <br />WITHIN 10 DAYS FOLLOWING ANY STORM WHOSE <br />BACKWATER ELEVATION EXCEEDS THE ELEVATION OF <br />6941.1 FEET ABOVE SEA LEVEL (10-YEAR, 24-HOUR <br />MAXIMUM STORM EVENT'S PROJECTED BACKWATER <br />ELEVATION),BY A QUALIFIED GEOTECHNICAL ENGINEER <br />OR ENGINEERING GEOLOGIST. A LETTER OF <br />CERTIFICATION CONTAINING THE RESULTS OF THAT <br />INSPECTION MUST BE SUBMITTED TO THE DNISION WITHIN <br />TWO WEEKS FOLLOWING THE INSPECTION. <br />NOTE: THIS STIP IS NOW KNOWN AS STIPULATION NO. 5 IN <br />RENEWAL NO. l <br />31. THE PERMIT RENEWAL OF THE SENECA II MINE IS <br />CONDITIONED UPON THE RESOLUTION OF KENTUCKY <br />CIVIL PENALTY VIOLATIONS AND BOND FORFEITURE <br />