My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33119
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:16 PM
Creation date
11/23/2007 7:31:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
10/22/1981
Doc Name
List - complete list of original stipulations
From
MLR
To
FILE NO C-007-80
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSM11 Findings Ibcument: Stipulation No. 23, p. 8 <br />OSM TEA: Stipulation No. 18, p. 54 as follows: <br />18. Stipulation: Drainage waters from drainage basin 20 must be retained <br />with the appropriate structures to allow settling. The applicant shall <br />provide the regulatory agency with a complete sediment control plan for <br />drainage from this subbasin prior to initiation of construction. <br />NOTE: Stipulation No. 2 was inadvertantly repeated, in slightly different wording, <br />by both the State and OSb1. See stipulation No. 7 of this memo. <br />3. Stipulation: THE APPLICANT MUST SECURE AUTHORIZATION FROM THE DIVISION TO <br />LOCATE SURFACE FACILITIES WIT117N THE STREAM BUFFER ZONE OF THE NORTH FORK. <br />THIS AUTHORIZATION ST E BTAINED PRIOR TO INITIAT NG p`NyTDISTURBANCE TO <br />LOCATE SURFACE ACIL E k'ITHIN THE ER ZONE. ~ ~`I~ <br />///\r ~ ~,//~ I` <br />M11LRD Findin s cu nt: ipulation 3 pf'a/" <br />OSM Findings Document: Stipulation No. 28, p. 8 as follows: <br />28. The applicant must secure authorization form the regulatory authority to <br />~• locate surface facilities within the stream buffer zone of the North Fork. <br />OSM TEA: Stipulation No. 25, p. 72 (same wording as No. 28 in the OSFf findings <br />~~. CL document). <br />4 Stipulation: ARCO COAL COMPANY MUST PROVIDE \\TO T E DIVISION BY AUGUST 30, 1981 <br />SUFFICIENT DOCUMENTATION T T ALL RECLAMATION`FE$QUIRED BY 30 CFR CHAPTER <br />^ VII, SUBCHAPTER R NAVE N AIjZBY ~~~~ ~ ~.• <br />~ 1 <br />MLRD Findings Lbcumen t. S i u ~tion No. 97, p. 98 <br />~,~~~N~OSM Findings Document: Stipulation 110. 47, p. 12 <br />• ~J ~~ <br />3~ OSM TEA: This has not been included in the OSM TEA. <br />~ \` <br />~~~~Stipulation: PRIOR TO PLACEMENT OF DRAINAGE CULVERTS, ARCO COAL COMPANY SHALL <br />SUBMIT TO THE DIVISION B SEPTEMBER 30 981 A R VIS DESIGN FOR PIPES 10 AND <br />11 WHICH PROVIDES FI I NT FLAW CAPpIgI~~6P~E1L1Eil DITCH OVERTOPPING. <br />• P1LRD Findings Do ume lation No. 35, p. 44 ~ <br />~` <br />OSM Findings Document: Stipulation No. 29 (first part). p. 9 <br />OSh1 TEA: Stipulation No. 39 (listed as "b" under Section 817.180), p. 189 <br />6. Stipulation: PRIOR TO PLACEMENT OF DRAINAGE CULVERTS, ARCO COAL COMPAN}' SHALL <br />SUBMIT TO THE DIVISION B1' SEP//~~TT~~~ri~1B R 0, 1981 A PLAN A D IGN DRAWINGS FOR <br />CULVERT TRASH RACKS TO BE ZNV LL~ ON PIPES OF 3 IQ(C~F~'S OR-~L~SS WITHIN CROSS- <br />SECTIONAL DIhfENSION. Ivf ~ ~ ~~~(VnrJ <br />MLRD Findings Cocument: Stipulation No. 35, p. 44 <br />OSP1 Findings Document: Stipulation No. 29 (second part), p. 9 as follows: <br /> <br />.._~~~~: -...... ..... ...~,,..... ~ .~ .. .. vim: _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.