Laserfiche WebLink
37. Stipulation: THE APPLICANT MUST PRESENT PLAN SHOWING O I E OP NZhf{S7 <br />WILL BE SEALED TO PRE ENT U CON ROLLED MIN DIS H Ri,E P PLE ION <br />OF h1INING. THESE P/LAT~S SHA L E SUBb1YPTE TO H ~~~~yy'. ,~TO Y A HORITY <br />SIX (O) h1ONTNS AFTa<~R ~C'OhfPLE N OF THE TNR PORT LS INITIALLY PRO- <br />POSED TO BE INSTALL AND T R ASSOCIATED DEWATERIN FACILITIES. <br />MLRD Findings Document: Stipulation No. 2U, p. 17 <br />`., <br />X33 ~J OSM Findings Document: This stipulation has not been included in the OSM <br />\;1 findings document <br />OSM TEA: Stipulation No. 9, pp. 31-32 as follows: <br />9. Stipulation: The applicant must present plans showing how mine <br />openings will be sealed to prevent mine and flows upon completion <br />of mining. (Refer to TEA Review 817.15, 817.101). These plans <br />shall be submitted to the regulatory authority prior to the next <br />5-year permit. <br />NOTE: This stipulation is substantially the same as stipulation No. 10 of this memo. <br />38. Sti ula ti on: WITHIN MONTHS OF DIV SION A ROVAL OF THE APPLICATION, ARCO <br />COAL COMPANY, IN CONS IAT -N I IA, SHALL DEVELOP MUTUALLY <br />ACCEPTABLE SUCCESS CR ER IES DIVE S TI' ON RECLAIMED AREAS. <br />MLRD Findings Document: Stipulation No. 31, p. 41 <br />~ ~(:1 <br />OSh1 Findings Document: Stipulation No. 37, p. 10 <br />L, <br />r <br />OSh1 TEA: Stipulation No. 29 (listed as No. 3 under Section 817.117(D)), p. 147 <br />ry <br />39. Stipulation: ARCO COMPANY OR Y SUCCEEDING OPERATOR OF THE MT. GUNNISON <br />NUMBER 1 MINE, 1 ST SUB IIT O E DIV ZON AN ANNUAL HYDROLOGIC REPORT. <br />THIS REPORT HA CL A A ALL HYDROLOGIC DATA GATHERED <br />DURING THE YE AS 1 OF THE I CTS OF MINING DURING THE YEAR, <br />AND AN ESTIMATE'OF THE R JECT Ih1PA CT F h1INING IN THE FOLLOWING YEAR. <br />THIS REPORT SHALL ASSESS TI]E IhIPACTS MINING ON THE QUALITY AND QUANTITY <br />OF WATER IN SURFACE STREAh1S, SPRINGS, GROUND WATER AQUIFERS, MINE INFLOW <br />AND MIiJE DISCHARGES. <br />MLRD Findings Document: Stipulation No. 25, p. 37 <br />OSh1 Findings Document: Stipulation No. 10, p. G <br />OSP1 TEA: This stipulation has not been included in the TEA. <br />40. Stipulation: Th'E APPLICANT SHILL SUBh17T TO THE DIL'ISION AN ANNUAL REPORT OF <br />INFLOWS, DISCHARGES AND CONSUhIPTION OF WATER lJITHIN THE MINE. THIS REPORT <br />IS TO INCLUDF. A h17NE [JORKINCS' AIAP SNOWING THE LOCATION AND QUANTITY OF INFLO[/S; <br />A TABLE FEYED TO THE MINE MAP WHICH SHALL CONTAIN THE SOURCE (I.E. FAULT, <br />FRACTURES, E7'C.) QUANTITY, DURATION, AND QUALI TS' (I.E. PH, ELECTRO-CONDUCTIVITY <br />AND TEMPERATURE) OF ALL INFLO[/S; A TABLE CONTAINING RECORDS OF WATER UISCHARGED <br />FROrl THE h17NE, CONSUh1ED IN TIfE MINE AND Ih1PORTED FOR USE WITHIN THE h17NE; A <br />DISCU.S.S'ION OF' Th'E [DATER BALAIJCE WITHIN Th'E h;Ih'E; AND FINALLY A PROJECTION OF <br />HS'OROLOGIC Ih1PACT5 OF h1INING IN THE UPCOMING FEAP.. <br /> <br />