Laserfiche WebLink
<br />REVISED BID SCHEDULE (AUGUST 19, 1994) <br />HAWK'S NEST MINE BACKFILLING AND DRAINAGE CONTROL PROJECT <br />RN-MINES-COAL-10 <br />UNIT <br />QTY UNIT PRICE AMOUNT <br />1. Mobilization/Demobilization 1 <br />per specifications <br />2. Grading Coal/Fill Material & 1 <br />Topsoil Replacement <br />3. Hole Abandonment (methane) 1 <br />Job NA S~ °-° <br />Job NA 1.'1G75~°-° <br />Job NA 5 ADO °-° <br />4. Sediment Pond Removal & Drainage <br />Channel Reconstruction ~ <br />~' I Sb~ <br />a. Sediment Pond Removal 1 Job NA ,25AD°-O 3~u <br />° <br />~ <br />a8 <br />b. CMP-1 East Silo Area 1 Job NA 'JpD °- <br />° <br />~ <br />1 <br />~ <br />c. CMP-2 Collection Box to Pond 1 Job NA 5A0~~S- ~ 3 <br />d. CMP-3 Sediment Pond 1 Job NA 3~p -„_(__ <br />e. CMP-4 Sediment Pond 1 Job NA ~q>g° L `tsy <br />° <br />° <br />f. CMP-5 Access Road to Coal Storage 1 Job NA 3~ <br />- <br />g. East Mine Drainage Reconstruction 1 Job NA -IldoO ~_° ~ , <br />5. Revegetation <br />6. Additional Hours- Dozer CAT D-7H <br />or 215 FHP equivalent with operator, <br />if required (or other FHP) <br />1 Job NA ,Z$O <br />20 Hrs. ~f ~1.~ z 281}. ~fl <br />~~P= /6~D <br />7. Additional Hours- Backhoe CAT 426 10 Hrs. ~°O (v50 ~ <br />or 70 FHP equivalent with operator, <br />if required (or other FHP) <br />GRAND TOTAL (Enter here and on Invitation and Bid Schedule) Q Do <br />THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID C(II l`~ \c~ <br />Page 1 of 1 page <br />~~(/wu.~~ I f~~ ~ d <br />