Laserfiche WebLink
. . <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe. Executive Duecbr <br />iiiiiiiiiiiiiiuiii <br />999 <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON Director <br />Richard D. lamrti <br />Governor <br />M E M O R A N D U M <br />October 1982 <br />TO: Mike Savage 1J~'~I <br />FROM: Jim Pendleton ~ i""Y~"'~ <br />RE: Proposed Rep cement for Stipulation 112 for the Trapper Mine <br />Pursuant to your request.i have reviewed the stipulation amendments requested <br />by Trapper Coal Company. The company's proposal agrees to the completion of <br />the annual post-mining topography but delays the completion of the first map <br />until January, 1989. This does not significantly effect our control of the <br />situation, particularly since flyash is not now being disposed of within the <br />backfilled area. With the following minor amendments the stipulation modification <br />is acceptable, in my opinion. <br />Stipulation 2A: <br />THE DIVISION DIRECTS THE PERMITTEE TO MONITOR POST-MINING TOPOGRAPHY OF~ <br />BACKFILLED AND REGRADED SURFACES OF THE DISTURBED AREA AT THE TRAPPER MINE. <br />MONITORING FOR THIS PURPOSE SHALL CONSIST OF A CONTOUR MAP (CONTOUR INTERVAL <br />NOT TO EXCEED 5 FEET) PRODUCED FROM AN ANNUAL SURVEY UTILIZING FIELD OR <br />AEROPXOTGRAMMETRZC TECHNIQUES ACCEPTABLE TO THE DIVISION. THE POST-MINING <br />TOPOGRAPHIC MAPS SXRLL BE SUBMITTED TO THE DIVISION FOR REVIEW AND APPROVAL <br />ON AN ANNUAL BASIS, COMMENCING IN JANUARY, 1989. <br />The second half of the company's proposal concerns the verification of the <br />projected overburden swell factor at the Trapper Mine. The proposed stipulation <br />modification defers resolution of this task to next year. Considering the <br />life of the mining operation this amendment also appears to be acceptable, in <br />my opinion. With the following minor amendments the stipulation can be <br />approved. <br />Stipulation 2B: <br />TTIE DIVISION DIRECTS THE PERMITTEE, ZN CONSULTATION WITH 2XE DIVISION, TO <br />PREPARE AND SUBMIT FOR APPROVAL A PLAN FOR VERIFICATION OF THE 25$ OVERBURDEN <br />SWELL FACTOR PROJECTED BY TXE PERMITTEE FOR THE TRAPPER MINE. THIS PLAN SHALL <br />Hf:' SUBMITTED IN ACCEPTABLE FORM WITHIN 6 MONT1f5 FOLLOWING PERMIT APPROVAL. <br />?'il (S PIJIIJ SHA Lh INCLUDE A SCHEDULE FOR COMMENCEMENT AND COMPLETION OF THE <br />VER1 Fl~CATION AS EXPEDITIOUSLY AS POSSIBLE. FURTHER, SHOULD THIS VERZFZCATZUN <br />I~f~CF.1:N AJJ INACCfIRACY WIfICX, IN TXE OPINION OF THE DIVISION, AFFECTS THE <br />Alll!, 1'f 1' OF T11F. OPERATOR TO ACHIEVE THE PROJECTED POST-MINING TOPOGRAPHIC <br />L'<;N J'f f..URATION, TffEN TXE OPERATOR SHALL REVISE THE MINING AND RECLAMTION PLAN <br />APf'ROYRIATEL3'. IN THE CASE THAT A REVISION OF THE PLAN IS NECESSITATED, TXE <br />REVISION SHALL BE SUBMITTED TO THE DIVISION FOR REVIEW AND APPROVAL [JITXIN <br />6 MONTHS FOLLOWING ISSUANCE OF THE DIVISION'S OPINION REQUIRING AMENDMENT OF <br />TXE PLAN. <br />cc: Brian Munson <br />423 Centennial Building, 1373 Sherman Slreel Denver. Colorado 80203 Tel. (303) 866-3567 <br />