Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />Permit No. CO-0045675 <br />Compliance Schedule Report <br />July 25, 2002 <br />Page 3 <br />Table 1 - RS-2 Surface Water Quality Results <br />Constituent Analytical Results <br />6/17/02 <br />Sample Collection Analytical Results <br />7/10/02 <br />Sample Collection <br />Dissolved Lead <0.005 <br />Total Manganese 0.12 <br />Dissolved Manganese 0.098 0.75 <br />Total Mercury <0.0002 <br />Dissolved Mercury <0.0002 <br />Total Nickel <0.01 <br />Dissolved Nickel <0.01 <br />Total Selenium 0.01 <br />Dissolved Selenium <0.01 <br />Total Silica 13.4 <br />Dissolved Silica 12.5 <br />Total Silver <0.0001 <br />Dissolved Silver <0.0001 <br />Tota! Zinc <0.005 <br />Dissolved Zinc <0.005 <br /> <br />Compliance Schedule <br />a) The permitttee shall conduct verification sampling at RS-2 within 3 days of the permittee's <br />receipt of any sample for a constituent identified as exceeding the applicable water quality <br />standard specified in Part III.A.2 of the Rationale. Results of the first verification <br />sampling shall be transmitted verbally to the WQCD by the end of the first calendar day <br />following the permittee's receipt of the analytical results. Tf the results of the first <br />verification sample indicate that the water quality standards in the Rito Seco are being <br />met, the normal monthly sampling schedule at RS-2 will resume as set forth in Paragraph <br />7. <br />Upon receipt of the initial water quality analytical results received on July 9, 2002 verbal <br />notification of the elevated Dissolved Iron and Manganese concentrations was made to the <br />WQCD via voice mail communication with Ms. Carla Lenkey. The voice mail identified the <br />elevated analytical results determined with the June 17, 2002 RS-2 sample collection and <br />identified plans associated with collecting and submitting the first verification sampling. <br />These communications were followed up with a personal communication with Ms. Lenkey <br />on July 11, 2002. <br />Collection of the first verification sampling was completed on July 10, 2002 and <br />hnmediately submitted to the commercial analytical laboratory that day with chain-of- <br />