Laserfiche WebLink
%' '~' Mr. Michael Boulay Page 2 <br />December 1. 1997 <br />LRP and the rest of the mine site, and does not include the subsoil pile on the LRP. <br />This pile had been considered as extra subsoil and is not needed for any reclamation. <br />The Sylvester Gulch subsoil pile has been designated for reclamation of the LRP. <br />Therefore, MCC's use of the subsoil pile is consistent with provisions in the permit as <br />the pile is considered extra soil and not needed for reclamation of the LRP, and has <br />not been designated as soil that is necessary to ensure soil productivity for other azeas <br />of the mine site, as defined in Rule 4.06.2(3). <br />Please call if you have any questions. <br />Sincerely, <br />Christine E. <br />Permitting ; <br />cc: Phil Schmidt <br />Kathy Welt <br />~,b~a.aa <br />