My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33037
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:14 PM
Creation date
11/23/2007 7:30:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
General Documents
Doc Date
5/1/1999
Doc Name
DOCUMENTED QUOTE GRASSY GAP COAL MINE MAINTENANCE PROJECT PKA-9-XXX
From
DMG
To
INTERESTED CONTRACTORS
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be refleded in a lump sum bid under Item 3 on <br />the Bid Schedule. This lump sum bid will cover all costs for cutting of the CMP riser, offstte disposal of the excess CMP <br />material, excavation of the embankment, form censtrud'an, purchase and installation of the bentontte, purohase and <br />installaton of the concrete, badcfilling and cempadion over the concrete, censtrudion and installation of the hinged <br />steel grate. Payment shall be as this task is completed and approved by the PROJECT MANAGER. Such payment <br />shall be considered full compensation for all labor, materials, equipment and all other items necessary and incidental to <br />the cemplefan of Task 3, Sediment Pond Dewatering Device Repair. <br />Task 4 Sealing Sediment Pond <br />In order to minimize the infiltration of water from the sediment pond, bentonite will be placed within the pond. <br />Bentonite shall be placed on the base of the pond and up the side slopes to the elevation of the lowest inlet of the <br />CMP riser. The area of the pond to be affected by this Task is estimated to be frfteen feel (15') in width, three hundred <br />feet (300') in length and about three feet (3') in depth. <br />CONTRACTOR shall ensure that the pond is free of water prior to initiating this Task. Upon completion of dewatedng, <br />'rf necessary, CONTRACTOR shall stake the elevation of the side slopes of the pond at the elevation of the lower most <br />inlet to the CMP riser. In order to ensure that the proper elevation is established, the use of a tdpod mounted <br />surveyors level is required. <br />The surface area of the pond to be afteded by this Task shall be scarified to a depth of four inches (4') through the use <br />of a disc harrow. Two inches (7) of dry bentonite shall be placed on the prepared work area after the discing is <br />completed. This material will be worked into the base and side slopes of the pond by discing the afleded area until the <br />bentonite is well incorporated into the scarified surface. <br />Measurement and Payment <br />There will be no measurement for payment. Payment for this task will be refleded in a lump sum bid under Item 4 on <br />the Bid Schedule. This lump sum bid will cover all costs for identifying the area to be affeded by this Task, preparation <br />of the area, and purohase and installation of the bentonite matedals. Payment shall be as this task is completed and <br />approved by the PROJECT MANAGER. Such payment shall be considered full compensation for all labor, materials, <br />equipment and all other items necessary and incidental to the completion of Task 4,Sealing Sediment. <br />Task 5 Equipment Rental <br />Areas in and adjacent to the Projed Area may require slope redudion, excavation or erosion control work. CAT 4168 <br />Badchoe loader or equivalent 74 fhp machine with operator and a five (5) cubic yard onloft highway end dump truck <br />with operator shall be furnished for additional work as needed. Additional rip rap materials maybe needed to armor <br />areas outside the rolled dip, and low water crossings. It is estimated that up to twenty cubic yards (20 yd 3) additional <br />rip rap material may be required. Of this, ten cubic yards (10 yd 3) must consist of two-inch (7) screened rode, and ten <br />cubic yards (10 yd 3) must consist of dean four inch (4') rode. The use of the rip rap material is NOT guaranteed. <br />The hours outlined in Item 5 of the Bid Schedule an: NOT guaranteed. All work will be accomplished accerding to <br />SpeciFicalan 19.0, Equipment Rental, attached. <br />Measurementand Payment <br />Measurement and payment will be made as per Specfication 19.0, Equipment Rental, which is attached. Payment will <br />be made at the unit prices established in Item 5 of the Bid Schedule. The hours outlined in Item 5 of the Bid Schedule <br />an: NOT guaranteed. Rip Rap will be paid by the cubic yard installed al the unit price bid in Item 5 of the Bid <br />Schedule. The use of the additional rip rap material is NOT guaranteed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.