My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33031
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:14 PM
Creation date
11/23/2007 7:30:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
4/19/1994
Doc Name
Guidance Document for Cement Bond Logging Technique
From
EPA
To
File
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY <br />r ~ REGION VIII <br />~~~r 999 18th STREET SUITE 500 <br />qp,r•~ OENVER. COLORA00 80202-2466 <br />.~u. -s ~5 <br />Ref: 8WM-DW <br />t~iORANDIJM <br />STJHJECT <br />FROM: <br />T0: <br />ar ^L'C~ .n <br />PSaal Guidance for Conducting a Pressure Teet to <br />Determine if a [dell Iia9 Leaks is the Tubing, <br />Casing or Packer <br />Tom Pike, Chief UIC Direct ~lementati~ <br />UIC Direct T_anlementation Permit Writers <br />The Underground Inject_on Control (UIC) regulations require <br />that an injection well have :mechanical integrity a[ all times (40 <br />CI'R 144.8 (f) (2) and 40 C:R 144.51 (q) (1)) A well `ins <br />mechanical integrity (40 CFR 146.8) if: <br />(1) There is no signi`icant_eak in the tubing, casing or <br />packer; and <br />(2) There is no signif_caat _°luid movement into an <br />underground source of drinking water (IISDW) through <br />vertical channels adjacent to the injection wellbore. <br />Definition: :dec!:an,cal _ategrity Pressure "'est `or Part I. <br />A pressure test urea tc determs-ne the ~ntegr_t•; ct ail the <br />dowru:ole comoorents ct ~ ia7ecrion well, usually <br />tubing casing and pacY.er. It is also used to test tubing <br />cemented is the hole by using a tubing plug or retrievable <br />packer. Pressure tests must he run ac least once every five <br />years. I! for any reason the tztbing/packer is pulled, the <br />iIIjectioa will is required to pass another macbaaical <br />integrity teat of the tubing casing and packer prior to <br />rnc~~~ciag injection rngardleea of when the last teat was <br />conducted. Teats rue by operators in the abaeace of as EP1- <br />iaspeetor mast be conducted according to thane procedures <br />and recorded oa either the attached fozm or as equilivaat <br />form containiaq the necessary information. A pressure <br />recording chart documentating the actual anaulua teat <br />pressures mast be attached to the form. <br />This guidance addresses making a determination of Part I <br />of '?echan~cal T_atearity ,ao 'eaks in the a:biag, casing or <br />a~~ v~Mn.e en a«r.i.r era, <br />
The URL can be used to link to this page
Your browser does not support the video tag.