My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32954
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32954
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:12 PM
Creation date
11/23/2007 7:28:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
9/21/2001
Doc Name
Final Permit Colorado Discharge Permit System-Stormwater
From
Stormwater Permit Ponds Folder
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />STORMWATER ANNUAL REPORT -METAL MINING (& COAL) <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVIILONMENT <br />Water Quality Control Division <br />WQCD-P-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246-1530 <br />Make enough copies of form or each reporting year. Or go to <br />httD://wt+~l+'•cdphe.state.co.us wq/Permits Unit/wgcdpmt.html <br />Permittee (Company Name): <br />Check box if this is a <br />new name, address, etc. <br />Facility Name: ^ <br />Mailing Address: ^ <br />Facility Phone Number: ( ) ^ <br />Permit Certification No. COR-04 _ _ _ _ <br />Reporting Period: Jan. 1-Dec. 31, 20 _ , (Form is due by Feb. IS of the following year) <br />**Each section must be completed. Please print or type.** <br />A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures <br />taken to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or <br />improvements made in any of your Best Management Practices (BMPs), employee training, spills, other <br />problems encountered, etc. How is your plan working?) <br />Were changes made to your SWMP? ^ No ^ Yes -Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspection made, including date, kndinAS, and action <br />taken. (The permit requires at least two comprehensive facility inspections per year for active mines, with <br />different requirements for other sites -see page 11 of the permit. Include here a summary of those <br />inspections, plus any other comprehensive inspections made. Do not submit separate inspection reports. <br />Also, it is not necessazy to surrunazize day-to-day inspections, unless significant problems were noted.) <br />First Inspection -Date _/_/_. Findings, and action taken: <br />Note -form may be reproduced Page 1 of 2 <br />ar9/Olmin <br />.._.:A,,.,: <br />
The URL can be used to link to this page
Your browser does not support the video tag.