My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32873
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32873
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:10 PM
Creation date
11/23/2007 7:27:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
7/14/1999
Doc Name
South Taylor Area Review Letter for Baseline Monitoring Proposal
From
DMG
To
Colowyo Coal Company
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Walker to Wolf <br />July 14, 1999 <br />Pale 2 of 2 Pales <br />In a related letter (May 25, 1999), Colowyo proposes no monitoring of ephemeral or intermittent <br />streams (omitted under Surface Water Sites, page 1). The Division asks that Colowyo include <br />the sampling of ephemeral or intermittent streams with the same program as for perennial <br />streams. Where such sampling is to take place would be specifically designated, as has been <br />done for all points to be sampled. This avoids requirements to classify streams. <br />In Table 3, please designate the 2nd and 4d' quarters for the semi-annual monitoring (based on a <br />calendar yeaz, Permit, page 4.05-12). The purpose of this change is to increase the probability of <br />flow at the time of sampling. <br />No monitoring frequencies were proposed for springs and seeps. From our telephone <br />conversation (and the July 12, 1999 e-mail), we understand that the program will apply to all <br />springs, not just the four lazgest flows (Colowyo letter of May 25, 1999). The Division suggests <br />the same monitoring parameters as for surface streams but with frequencies of 2"d and 4d' quarter <br />for field sampling of all springs, and 2"d quarter laboratory sampling for springs with flows <br />greater than 5 gallons per minute. <br />The monitoring frequency of stock ponds needs to be added to Table 3 <br />Please contact me if you have any questions. <br />Yours truly, <br />~~ ~ ~~~ <br />Byron G. Walker <br />Environmental Protection Specialist <br />Cc: James A. Kiger, Colowyo Coal Company L.P. <br />Dan Hernandez <br />Files CDMG Public <br />CDMG Working <br />C:\wpdocs\STExp.019.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.