My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32837
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:09 PM
Creation date
11/23/2007 7:26:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
General Documents
Doc Date
3/9/2007
Doc Name
Letter Regarding Postmine Channel Design & Permit Issues Meeting on 3/5/07
From
Seneca Coal Company
To
DRMS
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~+E~~A <br />a7 c~fc~~~r Seneca Coal Company <br />March 7.2007 <br />Mx. Michael Boulay C <br />Colorado Division of Reclamation, Mining and Safety ~ECE.IVE~ <br />1313 Sherman Street, Room 215 MAR p g Zp01 <br />Denver, CO 80203 <br />DivMning and Safety n <br />Re: Seneca Coal Company <br />-- _ -I'ostmine Channel Design & -Permit Issues Meeting on March,5, 24[17-- _ - - - - - - <br />Dear Mr. Boulay: <br />Thank you for taking time Monday to meet with representatives of Seneca Coal Company (SCC). We <br />believe the discussions were very helpful and significant progress was made toward meeting SCC's intent <br />to utilize turf reinforcement matting (I'RM) material in the design and construction of postmine channels <br />at the Seneca II, Yoast and II-W Mines. However, before we move forward we want to assure that <br />Colorado Division of Reclamation, Mining and Safety (CDRMS) and SCC are in consensus as to what <br />was discussed and agreed to during our meeting. <br />The issues that were discussed and the agreed direction for SCC to proceed are as follows: <br />• CDRMS is receptive tc. use of TR"•~1s as a substitute for rock riprap where SCC can demrnstra±e that <br />the design is stable. <br />Design storm runoff values will be estimated based upon a revegetated watershed condition and <br />curve number inputs will be selected from the approved values which are found in the respective <br />permit application packages. <br />-- - - - •- Channel geometry- for TRM installation will be-based-upon equipment-limitations._ :i'rapezoidal- - --_ <br />shaped channels will have bottom widths of either three-feet or 10-feet. Side slopes will be 4H:1 V. <br />TRM installation will follow manufacturer's recommendations. The matting edge at the top of a <br />channel will be trenched. Matting margins at the top of channel banks will be covered with soil <br />material to facilitate sheet flow entering the channel over the mat and not undercutting the TRM. <br />• With the technical revision (T'R) applications, SCC will provide typical designs for vegetated, rock <br />riprap and TRM channels. Summary tables will be updated as appropriate. The TRM designs will be <br />generic so that SCC may use more than one TRM product. SCC will include manufacturers <br />specifications in either tabular ox text format to facilitate CDRMS review of the designs. <br />Manufacturer's literature may also be included as reference material <br />• Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81839 <br />• Telephone (970) 2763707 • FAX (970) 276-3014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.