Laserfiche WebLink
This stipulation has been incorporated into the permit on page 2.05-69 (Technical Revision <br /> No. 59). <br /> STATUS: Terminated <br /> Stipulation No. 10 <br /> The Division directs Mountain Coal Company to complete a thorough <br /> reconnaissance geologic mapping of the proposed upper waste pile access roadway <br /> corridor. The applicant shall place specific emphasis upon the detection of slope <br /> instability evidence and drainage characteristics of the proposed road alignment. <br /> Further, the Division directs Mountain Coal Company, utilizing the results of the <br /> reconnaissance geologic mapping, and earlier adjoining surface facility road design <br /> studies, if appropriate, to complete a preliminary access road cut-slope stabilization <br /> and drainage design. <br /> The mapping and preliminary design shall be approved by the Division, in writing, <br /> prior to any disturbance of the access road corridor. <br /> This stipulation has been incorporated into the permit on October 27, 1989. It has been <br /> included on page 32 in the second part of Exhibit 50 in Volume 9. <br /> STATUS: Terminated <br /> Stipulation No. 11 <br /> The Division directs Mountain Coal Company to construct the upper waste pile <br /> access road as an initial pioneer road with minimized excavation. Upon exposure of <br /> the excavated cut-slopes of that pioneer roadway, the operator shall complete a <br /> final geotechnical investigation of the access road corridor. This geotechnical <br /> investigation shall be completed by appropriately qualified professional geological or <br /> engineering personnel. The purpose of this final investigation shall be to verify, or <br /> appropriately amend, the findings of the reconnaissance geologic mapping of the <br /> roadway corridor. <br /> Further, Mountain Coal Company, utilizing the findings of the final geotechnical <br /> investigation, shall complete a final engineered cut-slope and drainage design for <br /> the upper waste pile access road. This final design shall be approved by the <br /> Division, in writing, and the construction completed in accordance with that design, <br /> prior to the transportation of any waste material along that access road. <br /> This stipulation has been incorporated into the permit document on October 27, 1989, and <br /> can be found on page 32 in the second part of Exhibit 50 in Volume 9. <br /> STATUS: Terminated <br /> 7 <br />