Laserfiche WebLink
Minor Revision Description Decision/Date <br /> MR-92 Seal SOM 127H and drill SOM 129H AP 6/28/93 <br /> MR-93 Officers and directors for Atlantic Richfield Co. AP 7/01/93 <br /> MR-94 Disposal of Bear Coal Co. gob in West Elk refuse pile AC 7/01193 <br /> MR-95 Reclamation of portion of Raven Mesa Exploration AP 7/22/93 <br /> Road <br /> MR-96 Revised format for Semi-Annual Subsidence Reports AP 8/27/93 <br /> MR-97 Construct concrete gravel bunkers AP 8/27/93 <br /> MR-98 Powerline relocation AP 8/26193 <br /> MR-99 Topsoil relocation AC 9/14/93 <br /> MR-100 Temporary construction drainage plan AP 9/17/93 <br /> MR-101 Soil testing for new water tank foundation AP 9/15/93 <br /> MR-102 Include monitoring of Lone Pine Gulch Spring and AP 10/28/93 <br /> inventory structures <br /> MR-103 Paving the employee and mantrip parking lots and AP 10/28/93 <br /> lining ditches D1-1 and D1-2 with asphalt or concrete <br /> MR-104 Install french drains at various locations on the mine AP 10/28/93 <br /> site <br /> MR-105 Stockpile subsoil for berm construction AP 10/28/93 <br /> MR-106 Equipment and materials storage bench AP 1 1/03/93 <br /> MR-107 Designation of light-use roads AP 11/18/93 <br /> MR-108 Reconstruct stairway from bathhouse bench to ware- AP 11/12/93 <br /> house bench <br /> MR-109 Line pond MB-1 AP 11/12/93 <br /> MR-110 Topsoil balance evaluation AP 12/15/93 <br /> MR-111 Riparian/stream buffer zone variance and clarification AP 12/16/93 <br /> of Sylverster Gulch fan site reclamation <br /> MR-112 Temporary stockpile of coal refuse AP 12/20/93 <br /> Technical Revision Summary <br /> Technical Revision Description Decision/Date <br /> TR-63 Reconfiguration of lower refuse pile AP 7/09/93 <br /> TR-64 Response to Stipulations 44 and 45 (Renewal Issues) AC 9/03/93 <br /> TR-65 Construction of coal stacktube and reclaim system; AC 10/06/93 <br /> roads and pond redesign <br /> TR-66 Refuse pile minor reconfiguration (gravel drain) AP 12/21/93 <br /> 3 <br />