Laserfiche WebLink
Stipulation No. 39 <br /> Prior to the construction of the coal storage pad, a plan map must be submitted <br /> showing the proposed topography of the pad. This map must show the location of <br /> the clean water ditches, sediment ditches, and sediment trap and culverts. <br /> This stipulation was added to the approval of Technical Revision 58. <br /> STATUS: Complied with on November 25, 1991 <br /> Stipulation No. 40 <br /> Prior to disturbing the area of the storage pad, Mountain Coal Company must submit <br /> calculations to show that the sediment pond receiving the run-off from the storage <br /> pad is sufficiently sized to handle the calculated volume of water. <br /> This stipulation was added to the approval of Technical Revision 58. <br /> STATUS: Complied with on November 25, 1991 <br /> Stipulation No. 41 <br /> Prior to the importation of fill material to construct the coal stacking tube pad, <br /> Mountain Coal must submit bond calculations and update the reclamation plan for the <br /> removal of the fill material. The source of the fill material must be identified. If gob <br /> is to be used, this must be proposed as a technical revision and be supported with <br /> designs that meet the Division's performance standards for coal waste banks. Plans <br /> must be certified by a qualified engineer. <br /> This stipulation was imposed as part of Technical Revision 58. <br /> STATUS: Complied with on November 25, 1991 <br /> Stipulation No. 42 <br /> The information submitted with the technical revision and as part of stipulation <br /> responses must be incorporated into the new reorganized permit application. <br /> Stipulation responses must be submitted as minor revisions or, if gob is to be used as <br /> fill, that portion must be submitted as a technical revision. <br /> This stipulation was imposed as part of Technical Revision 58. Information regarding <br /> Stipulations 39 and 40 were addressed in Technical Revision No. 64. Bond calculations <br /> for removal of the gob in the fill was included during the 1991(92) renewal. Technical <br /> Revision No. 61 was submitted to utilize gob as a portion of the fill. <br /> STATUS: Complied With <br /> 16 <br />