My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32684
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32684
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:05 PM
Creation date
11/23/2007 7:24:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
12/9/1982
Doc Name
MINING PERMIT (Dated 12/3/82 to 12/3/87)
Permit Index Doc Type
PERMIT LEGAL DOCUMENT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A (cont'd.) <br />Z2. IF THE PROPERTY OWNER GtiISHES TO HAVE CERTAIN COAL LOADING FACILITIES <br />REMAIN INTACT FOLLOWING COIfPLETION OF ?1INZNG OPERATIONS, THEY 1fUST BE <br />REQUESTED I1J A LETTER TO THE DIVISION. IF THE LETTER IS NOT RECEIVED <br />WITHIN 90 DAYS OF PER112T ISSUANCE, THE APPLICANT PfUST REVISE THE <br />BONDING A1fOU1JT TO INCLUDE RElfOVAL OF THESE FACILITIES. <br />13. THE HAUL ROAD AND ACCESS ROAD DESIGNS MUST BE CERTIFIED BY R PRO- <br />FESSIONAL ENGINEER WITHIN 90 DAYS OF PERPfIT ISSUANCE. THIS CERTIFI- <br />CATION MAY BE 11ADE BY FORGJARDING A CERTIFIED STATE1fENT TO THE DIVISION. <br />14. THREE l10NTHS PRIOR TO CONSTRUCTION OF THE ACCESS ROAD TO POND F, <br />PLANS FOR THIS ACCESS ROAD CERTIFIED BY A REGISTERED PROFESSIONAL <br />ENGINEER MUST BE SUBMITTED TO THE DIVISIOI IN ACCORDANCE [JITH THE <br />REQUIREIg'NTS OF RULE 4.03.2. DIVISION APPROVAL FOR CONSTRUCTION OF <br />THIS ACCESS ROAD 11UST BE OBTAINED PRIOR TO ANY CONSTRUCTION OF THIS <br />STRUCTURE. <br />I5. THE APPLICANT 11UST CONFIRIf THAT RECLAlNATZON DELINEATED IN PHASE Z <br />HAS BEEN ACCOMPLISHED. THIS BUST INCLUDE O1JE TRANSECT ACROSS THE <br />POST-MINING SURFACE DEPfONSTRATING THAT THE PROPOSED SURFACE TOPO- <br />GRAPXY NAS BEEN ACCOMPLISHED. TX IS CONFIRMATION F1UST BE SUB147TTED <br />TO THE DIVISION PRIOR TO SUBMITTING THE BOND. <br />16. A PERFORI?ANCE BOND IN THE AMOUNT OF $550,249.00, PAYABLE TO THE <br />STATE OF COI.ORAAO, 19UST BE FILED 472TH THE DIVISION WITHIN 30 DAYS <br />FOLLOWING FINAL APPROVAL OF TXIS PROPOSED DECISION TO APPROVE THE <br />PERMIT. <br />17. EACH SCHEDULED INCRE1ENTAL BOND RI40UNT MUST BE FILED WITH THE <br />DIVISION AT LEAST THIRTY (30) DAYS PRIOR TO THE COMffENCE1IENT OF <br />SURFACE COAL 142NING AND RECLAMATION OPERATIONS IN THE INCREMENTAL <br />AREA CORRESPONDIPIG TO THAT BOND AlfOUNT. CONFIRMATION THAT <br />RECLAMATION SCHEDULE IN THE PREVIOUS PRASE OR INCREMENT 11UST <br />A00019PANY THE BOND R110UNT SUBMITTED TO THE DIVISION, <br />18. THE APPLICANT MUST IDENTIFY ON dfAP 17, PRE-MINING TOPOGRAPHY, ALL <br />OF THE AREAS THAT FALL UNDER THE CATEGORY OF STEEP SLOPE MINING. <br />TAE STEEP SLOPE CATEGORY DOES NOT APPLY TO AREAS THAT HAVE BEEN <br />OVERSTEEPENED BY PREVIOUS 1fINING. THE APPLICANT 11UST THEN <br />DE140NSTRATE COI7PLIANCE WITH RULE 4.27 FOR THE IDENTIFIED STEEP SI.oPE <br />AREAS. THE 1-!AP AND DEMONSTRATION MUST BE SUBMITTED TO THE DIVISION <br />WITHIN 120 DAYS OF PERMIT ISSUANCE. <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.