My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32641
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32641
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:04 PM
Creation date
11/23/2007 7:23:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
General Documents
Doc Date
8/18/1997
Doc Name
FEDERAL LEASES C-29125 & COC-49465 (7) FINDINGS
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or the Hay Gulch alluvium, has been adjudicated for a water right. La Plata Coal Corporation <br />• demonstrated during permitting of the La Plata No. 1 Mine that this water right has been <br />abandoned; therefore, no futther investigations or monitoring are being required. <br />Two water supply wells are located in the immediate vicinity of the facilities area: one at the Kir2 <br />Coal Mine and one at the La Plata No. 1 Mine. A third water well, located in an up slope terraa: <br />deposit, has been capped and abandoned. Although no completion data have been submitted, it <br />appears that the abandoned well was completed in the underlying Point Lookout Sandstone. The <br />National King Coal water supply well is completed in the Hay Gulch alluvial aquifer just west of <br />the facilities area. The La Plata No. 1 Mine well, which has been reported to be in existence sin¢ <br />about 1905, is located near the facilities area of that mine. This well, for wlch a water right has <br />been filed is probably completed in the Point Lookout Sandstone. <br />Information concerning other wells within one mile of the permit boundary is contained in section <br />2.04 of the permit document. <br />Surface Water Hydrology <br />The surface facilities of the King Coal Mine are located in a small ephemeral drainage basin which <br />is tributary to Hay Gulch. The permit area and underground mining extending to the with of the <br />surface facilities and underlay another small ephemeral drainage basin which is tributary to Pine <br />Gulch. Pine Gulch flows into Hay Gulch approximately 4 miles downstream of the facilities area <br />• Hay Gulch is a tributary of the La Plata River and their confluence is located about 8 miles <br />downstream (southwest) of the King Coa] Mine. <br />There are no perennial streams within the permit area. Surface waer within the small ephemeral <br />drainage basin in which the mine is located is limited to tvnofffrom rainfall and snowmelt evenu. <br />Runoff from the undisturbed upper parts of the east basin is routed around the disturbed areas <br />through a ditch system. Runoff from the undisturbed west basin and the disturbed area is <br />conveyed through a system of culverts and ditches to two sediment ponds at the base of the 86 acre <br />contributing area. Discharge from the ponds enters Hay Gulch, a tributary of the La Plata River. <br />There is no flowing stream within the valley of Hay Gulch at the location of the mine. <br />Historically, streamflow has been diverted into an irrigationditch on the north side of Hay Gulch <br />Water for irrigation purposes is taken from the La Plata River and at times has been reported to <br />be high in salinity and therefore not suitable for irrigation. Because of this fact, the King Coal <br />Mine has agreed to sample the irrigation ditch twice a year for two irrigation seasons to create a <br />baseline and determine the quality of the ditch water. <br />An ephemeral stream channel may have existed in the bench area of the mine prior to disturbance <br />of the site in 1941. This pre-mining channel would have been located in the lower portion of the <br />mine. Runoff from larger events would occur as channel flow, whereas smaller events, would <br />primarily recharge the alluvium from side-slope areas. For this reason, apost-mining channel will <br />. be reconstructed in the current location of the facilities area. A review of the channel design <br />indicates it meets the requirements of Rule 4.05.3. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.