Laserfiche WebLink
-5- <br />Stipulation No. 16 <br />WITHIN 90 DRYS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT <br />A PLAN TO THE REGULATORY AUTHORITY FOR APPROVAL PROPOSING THE <br />INSTALLATION OF A STRUCTURE THAT WOULD DEMONSTRABLY DISSIPATE <br />THE ENERGY OF FLOW IN THE CHANNEL SUCH THAT EROSION OF THE <br />CHANNEL WILL NOT OCCUR. <br />Stipulation No. 17 <br />THE DIVISION DIRECTS SALT CREEK MINING COMPANY TO INSTALL SIGNS <br />AT THE PERMIT BOUNDARY AND AT STATION 67+00' ADJOINING THE HAUL <br />ROAD. THESE SIGNS, LEGIBLE FROM THE HAUL ROAD WHILE PROCEEDING <br />TOWARD THE PORTAL BENCH SHALL READ: "ROAD SLOPES SUBJECT TO <br />ROCKFALL AND SLOPE FAILURE - PROCEED WITH CARE." <br />Stipulation No. 18 <br />PRIOR TO CONSTRUCTION OF THE HAUL ROAD, THE PERMITTEE MUST <br />PROPOSE THE INSTALLATION OF ADDITIONAL ROAD SURFACE DRAINAGE <br />CULVERTS TO MEET THE SPACING REQUIREMENTS OF RULE 4.03.1(4)(e)(vi)(A). <br />ALTERNATIVE SPECIFICATIONS MAY BE UTILIZED UNDER THE PROVISIONS <br />IN RULE 4.03.1 (4)(e)(vi) IF THE PERMITTEE DEMONSTRATES THAT <br />THESE SPECIFICATIONS WILL NOT RESULT IN AN INCREASE IN EROSION. <br />la ti on No. 19 <br />R PERFORMANCE BOND IN THE AMOUNT OF $307,630.00, PAYABLE TO THE <br />STATE OF COLORADO RND THE OFFICE OF SURFACE MINING, MUST BE <br />FILED WITH THE DIVISION WITHIN 60 DAYS OF THE NOTICE OF PRO- <br />POSED DECISION. <br />