Laserfiche WebLink
<br /> <br />-3- <br />'a Stipulation No. 4 <br />rY a'I WITHIN 90 DAYS AFTER <br />AlU\ DENSIDTYIATONHEIMINEN <br />~Stipulatton No. 5 <br />r c1~ ,. <br />V`e4~\b~Y WITHIN 90 DAYS AFTER <br />THE DIVISION WITH AN <br />FOR THE REYEGETATED <br />PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE <br />ACCEPTABLE SUCCESS CRITERIA STANDARD FOR SHRUB <br />SITE. <br />PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE <br />ACCEPTABLE SPECIES DIVERSITY SUCCESS STANDARD <br />AREAS OF THE NINE. <br />~Stlpulatlon No. 6 <br />\~'~ WITHIN 90 DAYS AFTER PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE <br />y~ Iv\ THE DIVISION WITH ACCEPTABLE SUCCESS STANDARDS FOR COVER AND <br />~' ~` PRODUCTIVITY FOR THE AREAS TO BE RECLAIMED AT THE LOADOUT <br />FACILITY. ALSO, SPECIES DIVERSITY AND WOODY PLANT DENSITY <br />STANDARDS MUST BE PROVIDED FOR THE TRUCK DUMP - DRYLAND GRASSLAND <br />AREA. <br />Stipulation No. 7 <br />SNOWMASS COAL COMPANY SHALL CONSTRUCT ALL ADDITIONAL POWERPOLES AND <br />LINES AT NORTH THOMPSON CREEK MINE AND LOADOUT SO AS TO MINIMIZE <br />THE DANGER OF ELECTROCUTION TD RAPTORS. THE DESIGNS SHALL BE <br />~ SUBMITTED TO AND BE'APPROVED 9Y THE DIVISION PRIOR TO CONSTRUCTION. <br />Stipulatlon No. B <br />THE OPERA70R SHALL RESTORE THAT PORTION OF THE LOADOUT HAUL ROAD <br />WHICH DISTURBED PRIME FARMLANDS TD ITS PRE-MINING LAND USE OF <br />AGRICULTURE IN ACCORDANCE WITH RULES 2.06.6, 4.25, AND THE PLAN <br />CONTAINED IN THE APPROVED PERMIT APPLICATION. <br />Stipulation No. 9 <br />THE DIVISION DIRECTS SNOWMASS COAL COMPANY TO INSTALL SUBSIDENCE <br />MONUMENTATION, AS DESCRIBED WITHIN EXHIBIT 4-H OF THE PERMIT <br />APPLICATION, ABOVE ANY UNDERGROUND WORKINGS INSTALLED WITHIN THE <br />LIMITED EXTRACTION AREAS INDICATED ON MAPS A AND B OF EXHIBIT 4-H. <br />SURFACE SUBSIDENCE MONUMENTS SHALL BE INSTALLED AND SURVEYED AT <br />LEAST ONE MONTH PRIOR TO UNDERMINING. <br />~' <br />