Laserfiche WebLink
<br />Stipulation No. 10 <br /> <br />WITHIN 90 DAYS OF PERMIT RENEWAL APPROVAL, THE PERMITTEE WILL SUBMIT FOR <br />APPROVAL A DETAILED PROPOSED COMPACTION TESTING PROGRAM TO BE PERFORMED ON THE <br />COAL REFUSE WASTE PILE. THIS PROPOSED PROGRAM WILL ADDRESS COMPLIANCE WITH <br />APPLICABLE COh1PACTiuN Iftl1U11(tMGIVI~ UY F(ULL 4.IV.4l,7/lD). 1F IHE TE~I11'IG <br />PROGRAM INDICATES THAT THE COAL REFUSE WASTE PILE DOES NOT MEET THE APPLICABLE <br />COMPACTION REQUIRE- MENTS OF RULE 4.10.4, THE PERMITTEE WILL SUBMIT AND COMMIT <br />TO IMPLEMENTATION OF PLANS FOR A STABILITY EVALUATION TO ASSESS COMPLIANCE <br />WITH THE OVERRIDING STABILITY DESIGN CRITERIA OF RULE 4.10.4(2). <br />Stipulation No. 11 <br />WITHIN 18G DAYS OF PERMIT RENEWAL APPROVAL, THE PERMITTEE WILL SUBMIT FOR <br />APPROVAL PLANS FOR HIGHWALL ELIMINATION AS ALLOWED BY THEN CURRENT REGULATORY <br />REQUIREMENTS FOR ALL REGULATED HIGHWALLS WITHIN THE PERMIT AREA. THESE PLANS <br />SHOULD FACILITATE REVIEW AND DEVELOPMENT OF SITE-SPECIFIC RECLAMATION MEASURES <br />FOR INDIVIDUAL HIGHWALL SEGMENTS TO BEST MEET OVERALL RECLAMATION OBJECTIVES. <br />Stipulation No. 12 <br />WITHIN 30 DAYS OF PERMIT RENEWAL APPROVAL, THE PERMITTEE WILL SUBMIT TO THE <br />DIVISION COPIES OF WRITTEN COMMENTS CONCERNING THE PROPOSED POST-MINING LAND <br />USE FROM THE SURFACE OWNERS OF THE PERMITTED AREA. WRITTEN COMMENTS FROM ANY <br />STATE OR LOCAL GOVERNMENT AGENCIES HAVING LAND-USE JURISDICTION WILL ALSO BE <br />PROVIDED PER RULE 2.05.5(1)(b). <br />-3- <br />