Laserfiche WebLink
--.-~ -= <br />tN~. <br />ENQ~NEERINO AND ENVIRONMENTAL DIVI810N <br />777 LINCOLN AVE. <br />P.O. BOX 71018 <br />STEAMBOAT SPRINGS, CO B0/7T <br />-- ~-- _. <br />February 21, 1985 <br />~II II~II~II~~I~~ ~I~ <br />sss <br />RECEIVED <br />FEB 2 5 ~°~~ <br />M1NED LAND REClAMA1TON DIVISIOfI <br />Colo. Dept of Na[ural Resources <br />Ms. Susan Mowry <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Bear Coal Company Flood Control Plan <br />Dear Sue: <br />This letter is in regard to the Bear Coal Company Mine No. 3 Flood <br />Control Plan which has been approved by the Colorado Mined Land <br />Reclamation Division for construction. <br />During the fall of 1984, Bear Coal Company planned to complete <br />construction of a flood control dike which would protect the Bear Coal <br />Company Mine No. 3 facilities area from any high flood waters of the <br />North Fork of the Gunnison River during the spring, 1985 runoff. Bear <br />Coal Company worked diligently with the Colorado State Highway <br />Department to obtain fill material to construct the dike. <br />Negotiations with the Highway Department to date have been <br />unsuccessful in obtaining the fill material; therefore, Bear Coal <br />Company was not able to construct the dike as scheduled. <br />Due to the necessity of having a dike in place prior to spring runoff, <br />Bear Coal Company plans to continue working with the Highway <br />Department and other personnel in the Somerset, Colorado area to <br />obtain suitable fill material so that the dike can be constructed. <br />Current site conditions preclude dike construction until after the <br />frost has left the ground and the snow melted. Normally, spring <br />runoff is expected to peak during the last week of May or the first <br />week of June. The Bear Coal Company Mine No. 3 site conditions are <br />suitable for dike construction during the last part of April and first <br />part of May. Therefore, sufficient time is available for construction <br />of the flood control dike prior to the spring runoff. <br />