Laserfiche WebLink
~~~-~i~~ <br />f~orr ~ ~/Lt G ®~V ~~ <br />CIRCES Cost Estimating Software ~~ <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 16-Dec-2002 '/ Permit or job no.: M-1992-100 / Site :River Bottom Gravel / <br />User : SSS Abbreviation : none State :Colorado <br />Filename : M100-000 County :Delta <br />Agency or organization name : DMG <br />Permit or job action :Routine Reclamation Cost Estimate Update L~ <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />01 a -Regrade processing/stockpile area grader 1 8.8 $642 <br />02a -Remove dike from river loader 1 7.1 $430 <br />03a -Transport equipment to/from site mobilize 2 2.2 $538 <br />04a Dispose of misc debris demolish 1 3.0 $126 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> suerorALS: 21.3 $1,736 <br />• includes inflation factor adjustment of: NA % TOTAL DIRECT COST' $1,736 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Liability lnSUranCe <br />Performance bond <br />Job superintendent <br />Profit ~a <br /> <br />: 1.55 %Of dlreCt total= <br />: 1.05 % of diroct total = <br />: NA' NA NA total = <br />: 10.00 % of direct total = <br /> <br />$27 <br />$18 <br />NA <br />$174 <br />'not required (or eqp. operator serves as super) <br /> <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracUbid preparation <br />Reclamation management and/or administration : TOTAL O 8 P = <br />CONTRACT AMOUNT (direct ~ 0 8 P) _ <br /> <br />: NA NA NA total = <br />5.00 % of cntr. NA total = $219 <br />$1, 955 <br /> <br />NA <br />$98 <br />CONTINGENCY- NA' NA total= NA <br />'contingencies accounted Poraf task level TOTAL INDIRECT COST= $316 <br />yl-~.:~- ^3~$Ty.~'OTAL BOND AMOUNT (direct+ indirect) = 52,~~y0',52 <br />~~s ~ ~ * .' ~~~w~~11~ `.•..q.ti. d..„4~U.~~~.. _.v.. «~.8-.L~ .y iltR f' ad2. PL ~ 'j~.f .a."~~e4"'~+. iii. <br />