Laserfiche WebLink
<br />lz <br /> f T <br />d i <br />T <br />bl <br />1 <br />D <br />fi <br />iti <br />U <br /> erms <br />a <br />e <br />n <br />on o <br />se <br />n <br />e <br /> Quarry operation. Construction and maintenance of haul road to Highway 8, <br />' service road and other facilities - mining, crushing, sorting, stockpiling <br /> and loading of rock and rock products. <br />' Haulin Carrying rock products to their destinations in trucks. <br /> On site. Impacts that occur within the quarry area or along the right-of- <br />' way of the haul road to Highway 8. <br /> Off site. Impacts that occur elsewhere. <br />' + Positive impact. <br /> - Negative impact. <br /> 0 No material impact expected. <br />' <br /> 1. A potential impact can be avoided by appropriate actions during the <br /> operation. <br />' 2. A temporary impact is expected for the duration of the operation. <br /> Natural recovery is expected when the operation ceases. <br />' 3. An impact is expected which will be permanent unless corrective actions <br /> are taken. With appropriate corrective actions it will be temporary. <br />' 4. A permanent and irreversible impact is expected. <br /> Table 1 includes all impacts of the quarry, both past and future. A circle <br /> around the the rating means that no future impacts are expected; the whole <br />' impact has already been experienced. No circle means that additional impacts <br /> are expected in the future. <br />1 <br /> <br />1 <br />1 <br />1 <br /> <br />LJ <br />1 <br />