Laserfiche WebLink
~' ~. • • <br />Rider to Mining Permit <br />West Elk Mine (C-60-007) <br />Page 2 of 3 <br />THE PRE-EXISTING SLOPE INSTABILITY. IF SUCH LANDSLIDE ACTIVITY IS <br />DISCERNED, THE OPERATOR WILL BE REQUIRED TO APPROPRIATELY <br />RECONFIGURE THE PILE DESIGN, PRIOR TO INITIATION OF ANY CONSTRUCTION <br />ACTIVITY. <br />18. THE DIVISION DIRECTS MCC TO COMPLETE A DETAILED ANALYSIS OF THE <br />POTENTIAL EFFECTS UPON THE SLOPE STABILITY OF TIIE LANDSLIDE DEPOSITS <br />ADJOINING BEAVER RESERVOIR. MCC SHALL INSTALL AND MONITOR AN <br />APPROPRIATE SET OF MONUMENTS ON THE LANDSLIDE DEPOSITS IN ORDER TO <br />OBSERVE THE POTENTIAL DISPLACEMENT' OF THE LAND FORK. THE DETAILED <br />ANALYSIS SHALL BE COMPLETED AND SUBMITTED TO THE DIVISION FOR <br />REVIEW, PRIOR TO REQUEST FOR APPROVAL TO EXTRACT COAL BENEATH THE <br />LANDSLIDE DEPOSITS ADJOINING BEAVER RESERVOIR. <br />19. THE DIVISION DIRECTS MCC, AS A PORTION OF ITS SUBSEQUENT PERMIT <br />APPLICATIONS FOR THE MINE, TO SUBMIT REVISED SUBSIDENCE EVALUATIONS. <br />THE SUBSIDENCE EVALUATION FOR EACH PERMIT RECORD REQUESTED SHALL <br />INCORPORATE THE RESULTS OF SUBSIDENCE MONITORING AND THE LANDSLIDE <br />STABILITY STUDIES COMPLETED TO DATE, AS STIPULATED ABOVE. PARTICULAR <br />ATTENTION SHALL BE FOCUSED UPON DESIGNATED SAFE AREA BUFFERS, TO BE <br />OBSERVED [N FUTURES MINING BENEATH CRITICAL AREAS, INCLUDING THE DRY <br />FORK OF MINNESOTA CREEK, AND BEAVER RESERVOIR AND THE LANDSLIDE <br />DEPOSITS ADJOINING IT. THE AMENDED SUBSIDENCE EVALUATIONS SHALL <br />INCLUDE THE PROPOSAL OF APPROPRIATE SUBSIDENCE MONITORING NETWORKS <br />WITHIN EACH OF THESE DESIGNATED AREAS. <br />57. WITH SUBMITTAL OF PR-06, MCC HAS REMOVED ALL PERMIT DOCUMENT <br />REFERENCES TO MINING BENEATH DRY FORK OF MINNESOTA CREEK <br />INTERMOUNTAIN DI V ERSION AND RESERVOIR SYSTEM, INCLUDING REFERENCES <br />TO BUFFER AREAS AND ASSOCIATED SUBSIDENCE CONTROL PLANS. <br />PREVIOUSLY APPROVED SUBSIDENCE CONTROL PLAN DOCUMENTS ARE <br />MAINTAINED IN THE DIVISION'S FILES. <br />THE DIVISION HAS NOT, AND WILL NOT, APPROVE ANY MINING WHICH WILL <br />POTENTIALLY AFFECT EH DRY FORK OF MINNESOTA CREEK INTERMOUNTAIN <br />DIVERSION AND RESERVOIR SYSTEM, INCLUDING ALL PREVIOUSLY DESIGNATED <br />BUFFER AREAS, UNTIL AND APPROPRIATE SUBSIDENCE CONTROI. PLAN IS <br />SUBMITTED AND APPROVED. <br />