My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32417
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32417
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:59 PM
Creation date
11/23/2007 7:18:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
General Documents
Doc Date
1/25/1984
Doc Name
OSM Permit No. C0-0030
Permit Index Doc Type
Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number CO-0030, 1/84 <br />Page 6 of 9 <br /> <br />Stipula*_ion No. 4 <br />THE OPERATOR SHALL SUBMIT A PL.4i'1 TO THE DIVISION TO CONTROL THE EROSIVE <br />UELOCITIES OF ALL DRAINAGE ITCHES WITHIN THE FEDERAL LEASE PERMIT <br />REVISION AREA WITF! DESIGN VELOCITIES IN EXCESS OF 5 FEET PER SECOt1D <br />WITHIN 90 DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 5 <br />THE SURFACE WATER MONITORING PROGRAM 'H'ILL INCLUDE THE FOLLOWING <br />MONITORING FREQUENCY AND ALL WATER ANALYSES WILL BE PERFORMED USiP1G THE <br />PARAMETERS LISTED BELOW: <br />MONITORING SITE <br />GESIGNATION <br />Sl <br />S2 <br />53 <br />MONTHLY <br />MONTHLY <br />MONTHLY <br />P.EQUIRED PARAMETERS <br />pH (FIELD) <br />COWDUCTIVITY AT 25oc (FIELD) <br />TOTAL DISSOLVED SOLIDS <br />TOTAL SUSPENDED SOLIDS <br />OIL AND GREASE <br />SODIUM ABSORPTION RATIO <br />BICARBGNHTE <br />CALCIUM <br />MAGNES I Utd <br />NITRATE <br />SODIUM <br />WATER SAMPLING <br />FREOUEiJCY <br />QUARTERLY <br />QUARTERLY <br />QUARTERLY <br />SULFATE <br />ALU~~II NUM <br />ARSENIC <br />CADMIUM <br />IRON <br />LEAD <br />h1ANGANESE <br />MERCURY <br />MOLYBDENUM <br />SELENIUM <br />ZINC <br />RESULTS OF THE MONITORING PROGRAM i~1UST BE SUBMITTED TO THE DIVISION <br />SEMI-ANNUALLY. <br />Stipulation No. 6 <br />DURING RECLAMATION OPERATIONS, THE OPERATOR <br />AVAILABLE TO?SOIL. IF AT LEAST SIX INCHES <br />FOR REPLACEMENT, THE APPLICANT ;OUST OBTAIN <br />SOIL MATERIAL FOR REVEGETATION PURPOSES TO <br />LEAST SIX INCHES ON ALL DISTURBED AREAS OF <br />AREA. <br />Stipulation No. 7 <br />MUST SALVAGE AND REPLACE ALL <br />OF hWTERIAL IS NOT AVAILABLE <br />ENOUGH ADDITIOtJAL SUITABLE <br />PROVIDE A TOPSOIL DEPTH Ur" AT <br />7HE FEDERAL LEASE MINE PERMIT <br />THE APPLICANT ~4U5T PROVIDE FOR ADEQUATE STABILIZATION OF THE S7=EPER <br />SLOPES DURING THE FIRST YEAR OF RECLAMATION. THE PLAN f4UST BE APPROVED <br />BY THE DIVISION !,JITHIN 90 DAYS AFTER THE FIRST SURFACE DISTURBANCE <br />FLOW MEASUREMENT <br />FREQUENCY <br />~~ <br />WITHIN THE FEDERAL LEASE AREA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.