Laserfiche WebLink
1 <br />%f <br />OHIO CREEK NO. 2 PROJECT <br />BOND FORFEITURE PERMIT #C80-002 <br />PROJECT OVERVIEW <br />The Ohio Creek No. 2 Bond Forfeiture Project is located in the Ohio Creek drainage north <br />of the town of Gunnison. The project consisted of 1 mine site that is situated within <br />Section 16, T15S, R86W. The mine site is on the Squirrel Creek (19651, U.S.G.S 7 1/2 <br />minute quadrangle. <br />The project was bid in accordance with State bidding procedures. The project was <br />awarded to JA Clarke Corp., of Gunnison, Colorado. Final project costs totaled <br />519,104.50. The project had the following changes to the original purchase order: <br />11 August 5, 1996 <br />Additional quantities of trash were encountered during the excavation of the portals to <br />verify competent bulkhead seal construction. Additional excavator time was needed to <br />assess these portal conditions. <br />2) October 21, 1996 <br />Additional trash encountered outside the work area needed disposing of as well as <br />additional machine work to finalize a turnaround. Fencing was constructed to prevent site <br />grazing to allow for vegetation establishment. <br />CONSTRUCTION SUMMARY <br />Bid Number <br />Pre-bid Meeting Date: <br />Bid Opening Date: <br />Low Bid Amount: <br />Number of Bids: <br />Notice of Award Date: <br />Notice to Proceed Date: <br />Construction Start Date: <br />Construction Completion Date: <br />Final Settlement Date: <br />Contractor: <br />Address: <br />Phone: <br />Final Cost: <br />PKA-7-374 <br />June 4, 1996 <br />June 18, 1996 <br />S 14,400.00 <br />10 <br />July 22, 1996 <br />July 22, 1996 <br />October 22, 1996 <br />November 18, 1996 <br />JA Clarke Corp <br />119 S. Main St. <br />Gunnison, CO 81230 <br />970/641-2526 <br />519,104.50 <br />The contractor proceeded with grading without an inspection point regarding the placement <br />of benign materials to be buried with regrading including block and lime. During portal <br />excavation to inspect closure conditions, large amounts of trash were encountered. <br />Revegetation was initially scheduled to be completed on October 7 and 8, 1996. Seed may <br />have been worked into the soils too deep by utilizing the D5 LGP to "crimp" the mulch via <br />grouzers. <br />