Laserfiche WebLink
Mr. William A. Bear -5- June 22, 1982 <br />Stipulation No. 13 <br />The response requests an extension of the one-month time frame,~to allow Bear Coal <br />Company to "delineate the potential for use of a de tinite coal loadout site." <br />As discussed with representatives of Bear Coal Company, an extension can be <br />granted. However, prior to any mining of coal at the Bear No. 3, Bear will be <br />required to identify the loddout or loadouts to be used. If the Zoadout facilities <br />have not been permitted by this Division, Bear will be required to submit an <br />operation description, a sediment control plan, and a reclamation plan for the <br />loadout. This plan would have to be submitted to af~d approved by the Pi vision, <br />and incorporated into the permit prior to production of coal from the Bear No. 3. <br />Stipulation No. 19 <br />The response satisfies the requirements of the stipulation. <br />Stipulation No. 15 <br />The subsidence monitoring plan should specify the number, alignment and location <br />of subsidence monuments. In~addition, a typical monument detail drawing must <br />be provided. <br />If you have any questions regarding these comments, please contact me. <br />Si cerely, <br />~~ ~ <br />/n.~_. <br />Dan T. Mathews <br />Reclamation Specialist <br /> <br />DThf/mmt <br />cc: Mr. Al Czarnowski <br />n <br />