Laserfiche WebLink
~ ~ ~ ~N~. <br />-iiiiiiiiiiiiiiuiii <br />999 <br />Doc Date:12/11/2001 <br />ENGINEERING AND ENVIRONMENTAL DIV ISION <br />]]] LINCOLN AVE. <br />P.O. BO% ]]YV61 <br />STEAMBOAT SPRINGS. CO BOa]] <br />July 8, 1982 <br />~0~/879.6$60 <br />REGE6d/~~ <br />JUL 12 1982 <br />Mr. Dan T. Mathews MINED LAND RECLAMATION <br />Mined Land Reclamation Division <br />Department of Natural Resources Colo. Dept. of Natural Resources <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Re: Bear No. 3 Response to Clarification <br />' of Bear No. 3 Stipulation Response <br />Dear Dan: <br />I appreciate your assistance in working with Eldon Strid and Jon Pratt <br />of this office regarding additional information needed on the <br />stipulations for the Bear No. 3 Mine. The fallowing responses are in <br />' regard to the clarifications requested in your letter of June 22, <br />1982. <br />' Stipulation No. 1 <br />I. Design and Layout of Treatment System <br />A. ttethod of Treatment <br />The method of treatment to be utilized by Bear Coal Company <br />will be a continuous application of pre-mixed flocculent.-or <br />coagulant. The typical design of the planned system is <br />shown on Figure 1. The location of the distribution point <br />' is shown on the Drainage and Sediment Control Plan Map (t•tap <br />S-1). <br />B. Type and Dimensions of Mixing Chamber <br />The mixing of the coagulant will be completed in two stages. <br />Initial mixing of the coagulant with water will be completed <br />' in the filter darn/dugout pond. The second portion of the <br />mixing will take place as the water flows through the Ditch <br />"D" into the sediment control structure. The filter <br />dam/dugout pond will be able to contain about 136 cu ft of <br />water. The channel length in which mixing will occur is <br />approximately 170 feet. <br />