My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32264
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:55 PM
Creation date
11/23/2007 7:15:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980080
IBM Index Class Name
General Documents
Doc Date
2/5/2004
Doc Name
Substitute Water Supply Plan Approval
From
OSE
To
Williams Turner & Holmes P.C.
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Thomas K. Snodgrass, Esq. <br />February 5, 2004 <br />Page 4 <br />16. This substitute water supply plan may be revoked or modified at any time should it be <br />determined that injury to other water rights has or will occur as a result of this plan. <br />17. Should this substitute water supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all excavation of product from below <br />the water table, and all other use of water at the pit, must cease immediately. <br />18. In accordance with amendments to Section §25-8-202-(7), C.R.S. and Senate Bill 89- <br />181 Rules and Regulations adopted on February 4, 1992, the State Engineer shall <br />determine if this substitute water supply plan is of a quality to meet requirements of use <br />to which the senior appropriation receiving the substitute supply has normally been put. <br />As such, water quality data or analyses may be requested at any time to determine if the <br />requirement of use of the senior appropriator is met. <br />19. The dry year analysis required by this office for a permanent plan for augmentation may <br />vary from the analysis approved in this substitute water supply plan. This substitute <br />water supply plan shall have no precedential or evidentiary force, and does not <br />constitute an admission or statement of position in any other proceeding. This plan shall <br />not be concurrent with any findings of fact or conclusions of law contained herein, or <br />with the engineering methodologies used by the Applignt. <br />Please contact Craig Lis of this office or Allan Martellaro, Division 5 Engineer, in Glenwood <br />Springs at (970) 945-5665, if you have any questions concerning this approval. We conclude that <br />approval of this substitute water supply plan does not imply a position by this office on any related <br />litigation. <br />f <br />c olfe, P.E. (~/ <br />Chief of Water Supply Branch <br />Attachment <br />ce: Allan Martellaro, Division 5 Engineer <br />James Lemon, Water Commissioner, Water District 39 <br />Ed Settle, Grand Junction Pipe & Supply Company <br />Bill Merrill, P.E., Western Water & Land, Inc. <br />Gary Witt, Wright Water Engineers, Inc. <br />Division of Minerals and Geology <br />C:\Project Files1011-009\270gdw Una\Una Pit Approval Letter.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.