My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32201
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:53 PM
Creation date
11/23/2007 7:13:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
General Documents
Doc Date
1/30/1985
Doc Name
EASTSIDE COAL CO INC PN C-84-063 STIPULATION 2 5 10 AND 11
From
EASTSIDE COAL CO
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ABR <br /> <br />January 30, 1985 <br />EASTSIDE COAL COMPANY, INC. <br />P. O. Box 161 <br />Sill, Colondo 81652 <br />(303) 8762944 <br />Joe Oliver, Reclamation Specialist <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman St. <br />Denver, CO 80203 <br />iii iuiiiiinm iii <br /> <br /> <br />[d1NED LD,rei! °FC'L1Md(:,-~++ ~IUjejON <br />COjO. Dajf. ul ii1:0:CI fdSOJ(Ce5 <br />Re: Eastside Coal Company, Inc. Permit No. C-84-063 <br />Stipulation 2, 5, 10, and 11 . <br />Dear Mr. Oliver: <br />Stipulation 2 requires a design for a non-clogging operation <br />~,:.:` of the orifice in Pond SP-2. The design is shown on Drawing <br />` 4, Sediment Pond SP-2. <br />Stipulation $ requires the revegetation success standard for <br />'•' the Eastside Mine be set at 35/. Pages 118 and 118A have <br />been revised to set the standard at 35/• <br />Stipulation 10 requires a plan to be submitted for the storage <br />and. disposal of non-coal waste generated at the min=. Revised <br />., ~... 1'1 ::i P. ~?1°~ ~r'. ~'.% 'l-„ ~?'i ..;mac-.o ~~r_l l ~,.~ _ __, ~i __ <br />.. _..~ol ..o. <br />Stipulation 11 requires Eastside to commit to implementation <br />of the subsidence monitoring plan as recommended by J. Hucka's <br />report contained in the application. Revised pages 123 and <br />123A state how Eastside Coal is going to implement the pro- <br />posed subsidence monitoring plan. <br />Sincerely, <br />~~~~C~ i' 1~ <br />Stephen Se4f <br />General Manager ~~~ <br />yam, ~ <br />Enclosures ~/ <br />(J ~ <br />tip" J-CsUe~,•- fro i7~/~ ~~ , <br />~[ _,.r °~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.